电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

w道路桥梁施工组织设计

107页
  • 卖家[上传人]:re****.1
  • 文档编号:475582167
  • 上传时间:2023-05-08
  • 文档格式:DOC
  • 文档大小:436.52KB
  • / 107 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • 1、security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt . (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero pr

      2、otection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the power, illumination, welding. 3, electricity lines: (1) electric line, required for overhead in

      3、stallation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up,

      4、 switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the black or green/Huang Shuang-color line as the grou

      5、nd wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming mach

      6、ines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)problems that canno

      7、t be ignored. Some leaders unwilling to do masses work, masses concept weak, on masses feelings not deep, pendulum not are with masses of relationship, think masses work is revolutionary war era of things, now obsolete has, buried business work, ignored masses work of situation compared General; some leaders not do masses work, old method regardless of with, new not with, not understand masses psychological, not understand masses wishes, not said masses language, work method simple stiff, caused

      8、 masses of conflict and antipathy; some leaders cant do masses work, Faced with a lot of contradictions among the people worry about fear, panic set in encounter group events, and some are even mismanaged, inflame, so work has suffered heavy losses, and so on. These problems we are soberly aware, enhancing the partys ruling capability, the maintenance and development of the partys advanced nature and purity, and to enhance the ability of party committees and leading cadres are good people. Attac

      9、h great importance to and is good at doing mass work, has become the new urgent situation strengthening the partys governing capacity-building tasks. Combined practice of maintaining flesh-and-blood ties with the masses, urged the broad masses of party members and cadres, especially all levels . Processing to improve as a guide to the country. What I did is summed up these new things, be promoted. This is a vivid manifestation of the Deng Xiaopings mass. Deng also put people support does not support, agreed not to agree, happy happy, promise not to promise as a starting point and destination of developing guidelines, policies, and as the only standard for measuring compliance with the wishes of the masses of the people. Under the guidance of Deng Xiaoping theory, Central Government adopted a series of important measures to strengthen links with the masses. In December 1989, the CPC Central Committee made on adhering to and perfecting the system

      《w道路桥梁施工组织设计》由会员re****.1分享,可在线阅读,更多相关《w道路桥梁施工组织设计》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.