    • 1、nts to SchoolsDec. 18, 2008徐立平 (Leon)沈山丹 (Lar) 李硕仁 (Lee Seog In)孙显燮 (Son Hyun Sub)Case 5-4Programming & Decision making by Dr. Chen LihuaIMBA2 Group 6Contents 1. Case Overview2. A linear programming model on a Spreadsheet & The Sensitivity report3. Assumption 1 for Problem4. Assumption 2 for Problem 5. Recommendations1. Case OverviewThe Springfield School Board has made the decision to close one of its middle schools at the end of this school year and reassign all of next years middle school stu

      2、dents to the three remaining middle schools. The school district provides busing for all middle school students who must travel more than approximately a mile, so the school board wants a plan for reassigning the students that will minimize the total busing cost.The annual cost per students for busing from each of the six residential areas of the city to each of the schools is shown in the table. In term of busing cost per student field, 0 indicates that busing is not needed and a dash indicates

      3、 an infeasible assignment.The School board also has imposed the restriction that each grade must constitute between 30 and 36 percent of each schools population. The above table shows the percentage of each areas middle school population for next year that falls into each of the three grades.2. A linear programming model and the sensitivity report Before showing model for this problem on spreadsheet, there are two issues for solving this Case with related to Case 3-5. One thing is that we can se

      4、t a linear programming model if there is no additional restriction that each grade must constitute between 30 and 36 percent of each schools population. The other thing is that we can establish this problem as a nonlinear programming model if the additional restriction of the school board is adapted to problem. l A linear programming model Target Cell Total Cost Adjustable Cells Assignment Constraints Area 2 to School 1 = NAArea 5 to School 2 = NAArea 4 to School 3 = NA Total Assignment = Area P

      5、opulation Total Assigned = School Capacity Option Assume Linear Model andAssume Non-Negative In order to solve from c to i at Case 5-4 and generate the sensitivity report, we will use this linear programming model. In addition, we will recommend to the school board as a conclusion after we consider all constraints including another restriction with respect to constitution of each grade in terms of schools populations percentage. l The sensitivity report (linear programming model)l Nonlinear prog

      6、ramming model(including another restriction of the school board) Above nonlinear programming model includes another restriction of the school board that each grade must constitute between 30 and 36 percent of each schools population. Target Cell Total Cost Adjustable Cells Assignment Constraints Area 2 to School 1 = NAArea 5 to School 2 = NAArea 4 to School 3 = NA Total Assignment = Area Population Total Assigned = School Capacity Grade percentage = Larger than (30%) Option Assume Non-Negativel

      7、The sensitivity report (nonlinear programming model)3. Assumption 1 for ProblemOne concern of the school board is the ongoing road construction in area 6. Theses construction projects have been delaying traffic considerably and are likely to affect the cost of busing students from area 6, perhaps increasing costs as much as 10 percent.l The busing cost from area 6 to school 1 How much the busing cost from area 6 to school 1 can increase (assuming no change in the cost for the other schools) befo

      8、re the current optimal solution would no longer be optimal? The figure below shows the relevant part of the sensitivity report for this problem.Adjustable CellsFinalReducedObjectiveAllowableAllowableCellNameValueCostCoefficientIncreaseDecrease$D$29Area6 School 10 500 5001E+30500$E$29Area6 School 20 300 3001E+30300 $F$29Area6 School 3450 0 03001E+30As shown in the yellow part, the number of student assigned from Area 6 to school 1 is 0 and the allowable increase is infinitive. So, it doesnt matter how much the cost of busing increases before the current optimal solution would no longer be optimal. The busing cost from area 6 to school 1 can increase infinitely. The current solution could be optimal whatever the road construction proceed between area 6 and school 1 because the number of student assigned from area 6 to school is 0.l The busing cost from area 6 to school 2As s

      《1GROUP6ASSIGNINGSTUDENTSTOSCHOOLS1218》由会员公****分享,可在线阅读,更多相关《1GROUP6ASSIGNINGSTUDENTSTOSCHOOLS1218》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.