    • 1、原文: A SPECIAL PROTECTION SCHEME FOR VOLTAGE STABILITY PREVENTIONTara Alzahawi Student Member, IEEE Mohindar S. Sachdev Life Fellow, IEEE G. Ramakrishna Member, IEEEPower System Research Group University of Saskatchewan Saskatoon, SK S7N 5A9, Canada Abstract Voltage instability is closely related to the maximum load-ability of a transmission network. The energy flows on the transmission system depend on the network topology, generation and loads, and on the availability of sources that can genera

      2、te reactive power. One of the methods used for this purpose is the Voltage Instability Predictor (VIP). This relay measures voltages at a substation bus and currents in the circuit connected to the bus. From these measurements, it estimates the Thvenins equivalent of the network feeding the substation and the impedance of the load being supplied from the substation. This paper describes an extension to the VIP technique in which measurements from adjoining system buses and anticipated change of

      3、load are taken into consideration as well. Keywords: Maximum load ability; Voltage instability; VIP algorithm. 1. Introduction Deregulation has forced electric utilities to make better use of the available transmission facilities of their power system. This has resulted in increased power transfers, reduced transmission margins and diminished voltage security margins. To operate a power system with an adequate security margin, it is essential to estimate the maximum permissible loading of the sy

      4、stem using information about the current operation point. The maximum loading of a system is not a fixed quantity but depends on various factors, such as network topology, availability of reactive power reserves and their location etc. Determining the maximum permissible loading, within the voltage stability limit, has become a very important issue in power system operation and planning studies. The conventional P-V or V- Q curves are usually used as a tool for assessing voltage stability and he

      5、nce for finding the maximum loading at the verge of voltage collapse 1. These curves are generated by running a large number of load flow cases using, conventional methods. While such procedures can be automated, they are time-consuming and do not readily provide information useful in gaining insight into the cause of stability problems 2. To overcome the above disadvantages several techniques have been proposed in the literature, such as bifurication theory 3, energy method 4, eigen value metho

      6、d 5, multiple load flow solutions method 6 etc. Reference 7 proposed a simple method, which does not require off-line simulation and training. The Voltage Indicator Predictor (VIP) method in 7 is based on local measurements (voltage and current) and produces an estimate of the strength / weakness of the transmission system connected to the bus, and compares it with the local demand. The closer the local demand is to the estimated transmission capacity, the more imminent is the voltage instabilit

      7、y. The main disadvantage of this method is in the estimation of the Thvenins equivalent, which is obtained from two measurements at different times. For a more exact estimation, one requires two different load measurements. This paper proposes an algorithm to improve the robustness of the VIP algorithm by including additional measurements from surrounding load buses and also taking into consideration local load changes at neighboring buses. 2. Proposed Methodology The VIP algorithm proposed in t

      8、his paper uses voltage and current measurements on the load buses and assumes that the impedance of interconnecting lines (,) are known, as shown in (Figure 1). The current flowing from the generator bus to the load bus is used to estimate Thvenins equivalent for the system in that direction. Similarly the current flowing from other load bus (Figure 2) is used to estimate Thvenins equivalent from other direction. This results in following equations (Figure 3). Note that the current coming from t

      9、he second load bus over the transmission line was kept out of estimation in original (VIP) algorithm. 1 2 3 4Where and are currents coming from Thvenin buses no.1 and 2. Equation (1)-(4) can be combined into a matrix form: *5Using the first 2 rows in the system Equations (1)-(4), the voltage on buses number 1 and 2 can be found as shown in Equation (6) below. From Equation (6) we can see that the voltage is a function of impedances. Note that the method assumes that all Thvenins parameters are constant at the time of estimation. 6Where, and The system equivalent seen from bus no.1 is shown in Figure 3. Figure 4(a) shows the relationship between load admittances ( and ) and voltage at bus no.1. Power

      《一种特殊的预防电压波动的保护方案毕业设计外文翻译》由会员re****.1分享,可在线阅读,更多相关《一种特殊的预防电压波动的保护方案毕业设计外文翻译》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.