电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

喷气式飞机BD5 制作指南

9页
  • 卖家[上传人]:图***
  • 文档编号:328762938
  • 上传时间:2022-07-31
  • 文档格式:DOCX
  • 文档大小:2.64MB
  • / 9 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • 1、Designed and Drawn by: Tony Audsley (Lockey)Suggested build specs:Material: 6mm Depron or MPF (approx one and a half full sheets) 1000 x 700 sheet Servos: 3 x HXT900 9g (or similar)Motor: D2826-6 2200kv Outrunner Motor (or similar)ESC: TURNIGY Plush 40amp Speed Controller (or similar) Prop: GS Sport 6x4E Precision propeller (or similar)These are the formers shown in the position they need to goThe Fuselage SkeletonFirst glue F8 and F9 in place on the “vertical former”Glue the “horizontal former”

      2、 to the “vertical former” and into F8Glue the top formers” in place as shownPlease note: The side panels and hatch panels are slightly oversize and any excess can be trimmed off after gluing in placeGlue in place the rest of the formers as shownAfter gluing, I use a sanding block to sand the formers to follow the shape of thefuselage and make it nice and smooth for the side panels to be glued on.Cut 2 x 10mm x 6 mm dou- blers from some scrap foam and glue onto the fuselage sides as shown.This is

      3、 for sanding and rounding a littleAlternative Rudder and Elevator controlThis shows the use of snakes for the control of elevator and rudder.This method has the added advantage of moving the servos up front to help with the balancing of the plane.Horizontal Stab and ElevatorPrepare the stab by gluing in the carbon fibre tube.Chamfer the edge of the elevator and hinge with your favourite method.Glue the control horn in placeTail Fin and RudderHinge the rudder to the tail fin (Vertical Stab) with

      4、your favourite hinging method.Attach the control horn to the rudder and firthe servo into the fin Connect the and testThe Side PanelsIf using Depron Stick clear packaging tape on the outside of the panels before rolling.(If using MPF, there s no need to use packaging tape)I use a piece or 20mm (3/4“)plastic reticulation pipe to roll the Depron aroundTail PipeAgain (if using Depron) stick clear packagingtape on the outside of the panels before rolling.IMPORTANT:If using Depron . Before bending-ro

      5、lling, stick clear packaging tape to the outside of the panels to stop them cracking (If using MPF, there s no need to use packaging tape)The horizontal stab can be glued in place and the control rods / snakes can be fitted and testedAfter test fitting, the LEFT side panels can now be fitted to the fuselage skeletonNow fit the tail finConnect up the servo horns and rodsRout the cables from the motor and servos andtest that everything is working OK.Once you are happy that everything is working OK

      6、 you can fit the right hand side panel in placeYou can now fit the motor And glue in place the tail cone.The HatchGlue the formers together and then glue on the top panels. IMPORTANT:If using Depron Before rolling the top panels, stick clear packaging tape to the outside of the panels to stop them crack- ing (If using MPF, there s no need to use packaging tape)Before gluing on the top panels, sand the formers and base to follow the contours.Showing tail cone and motor in placeAfter routing the s

      7、ervo wires, you can now attach the wingThe WingGlue the carbon fibre tube in placeHinge the ailerons to the wing with your favourite hinging method.Dihedral BraceOnce you have prepared both halves of the wing you can glue them together with the Dihedral as shown glue the dihedral brace in place (I like to use epoxy glue for this)Place one wing flat on the bench and block the end of the other up by 75mm (2.95 inches)I have used the “Torque Rod” methodfor operating the ailerons, but you could use other methods if you wish.Shape / sand the belly pan to shape and glue into placeLaminate the nose pack, glue into place and sand to shapeI use magnets to hold the hatch in placeStart with the C of G on the spar, turn upside down to make balancing easy

      《喷气式飞机BD5 制作指南》由会员图***分享,可在线阅读,更多相关《喷气式飞机BD5 制作指南》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.