    • 1、目 录Contents一、编制说明Explanation to the Compilation2二、工程概况 Project Profile2三、施工准备 Preparations for the Commencement3四、项目组织管理机构The Project Administration Organization6五、土建部分主要施工方法The Main Construction Method for the Civil Work8七、安装部分主要施工方法Main working plan for installation25八、季节性施工措施Working plan for seasonality35九、质量保证措施Quality guarantee measurement39十、工期保证措施The steps for time limitation guarantee43十一、安全生产措施Security Production Measurement47十二、现场文明施工措施Field civilization working measures57十三、环境卫生保护措施Sa

      2、nitation protectin measures58十四、施工总平面布置图The layout of the jobsite60十五、附图附表 The figure and attached list63一、编制说明Explanation to the Compilation1.1编制原则The Principles of the Compilation本施工组织设计只是根据业主所提供的资料以及结合现场条件、工程特点进行编制的,着重于施工方案、技术措施、施工管理措施、施工形象进度计划、现场平面布置、机械设备及人员组织机构配置、施工中的重点难点技术措施的编制。The present proposal, with a view to the bidding stage, is made and based on the technical specifications stated in the tender documents. It is concentrated in the execution plan, technical and management measures,

      3、progress scheme, site layout, machines and equipments, labor forces, site management organization and measures to be taken for the main and difficult work execution. It is only a proposal made to comply with the project drawings and the details stated in the bidding documents. This company will compile one complete and detailed execution schedule based on the Project characteristics and design demands1.2编制依据Gist for the Compilation本工程根据乌干达国家标准局项目招标文件、设计图纸、结合现场条件及工程特点进行编制;The compilation in accor

      4、dance with bidding instruction, design drawing, site condition and the characteristic of project for Ungada National Bureau Of Standards Administration Block Project.二、工程概况 Project Profile本工程为新建工程,工程位于:乌干达坎培拉市区。总使用面积为4826 m,新建建筑占地面积约1000 m。新建建筑地下室一层,地上最高五层,建筑高度为22.4米。由乌干达政府投资兴建,由Arch Forum Ltd公司设计。总工期为307天。This project is new construction, The site Located at Plot 2-12 by pass link, Bweyogerere.Total usable floor area is 4826 m, new construction occupies approximately 1000 m. The block is divide

      5、d sub structure and super structure. The height is 22.4 meters. The client is Uganda National Bureau of Standards. The lead consultant is Arch Forum Limited. The construction period is 307 days.三、施工准备 Preparations for the Commencement3.1现场准备 Site Preparation3.1.1按施工现场平面布置图搭建生产和生活临时设施,做好现场临时施工道路、施工用水电的布置、现场污水、雨水排放明沟,现场安全防护设施搭建等工作。Set up the temporary facilities for site production and life as per the site layout. Prepare well the temporary access, water and power, sewage disposal, rain water disc

      6、harge and the safety protection facilities and etc. for the commencement.3.1.2布置好现场的工程概况牌、安全生产标志牌、劳动纪律牌等“一图五牌”。Set up at the site the two charts and six boards: the project plate, safe production marks, work disciplines board and etc.3.1.3组织施工人员进场,并做好各项教育工作。Organize the work force, move into the site and do well educational work and others.3.2施工技术准备Preparations for execution techniques施工技术准备的主要内容,可以归纳为以下四个方面:一是组织图纸会审;二是编制开工前的各项方案、措施;三是进行工程定位,开展施工测量;四是完成技术、检验机制的建立。其具体内容是:The main thing in this re

      7、gard are the following four parts: study and examine the drawings; work out the schedules for the commencement; start the project location and surveying work; establish the mechanism of the technique identification and quality inspection. The details are:3.2.1及时组织技术人员,预算员认真熟悉施工图纸,参与图纸会审和技术交底; Timely organize the technicians and quantity surveyors to get familiar with all the drawings. They shall participate in the drawings studying and examining, and explain all the technical details.3.2.2编制施工图预

      8、算和月旬作业计划,提供材料的需要量计划; Work out the project budget and the schedules for monthly and 10-days site work, and also the materials supply plan.3.2.3商请建设单位组织移交、规划红线、座标、标高等;Consult with the Client to hand over the site, plot lines, bench marks and levels, etc.3.2.4组织专业技术人员进行模板和钢筋的翻样工作; Organize the professional technicians to work out shop drawings for all the moulding board and steel work.3.2.5做好各种进场材料的质量检验等准备工作。Do a good job in checking all those materials to be brought into the site and concrete mix

      9、preparations.3.2.6根据工程施工需要,结合外围电网的情况和市政供水管网的情况,进行施工用电用水设计。Work out the consumption schedule for the water and power needed for the project as per the requirements of the project execution and the status of electricity grid and city water supply.3.3主要机械设备、周转材料及劳动力资源配备Preparations of Major mechanical equipments, cycling materials and work forces根据本工程的施工规模及结构形式,为了顺利快速地完成本工程,交付给业主早日投产使用,拟投入的机械设备及劳动力详下表。As per the project scale and structural formation and in order to smoothly complete the execution so as to hand over to the client for the early operation, it is proposed to allocate of the following equipments and labor forces as the form listed below:主要施工机械和材料一览表Major Machines and Materials for the Project序号S.No名称Descriptions型号Model数量Qty单位Unit用电量/台(KW) Power Consumption 进场安排Date to bring in1挖掘机Excavator1辆Unit2.82砼搅拌机Concrete MixerJZC5001台

      《乌干达国家标准局施工组织设计合并》由会员s9****2分享,可在线阅读,更多相关《乌干达国家标准局施工组织设计合并》请在金锄头文库上搜索。

      点击阅读更多内容
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.