    • 1、Table of Contents目录1.0Purpose目的42.0Scope 范围43.0Terms and Definitions 术语和定义44.0Roles and Responsibilities岗位和职责54.1UBR Project Director/UBR项目总监54.2UBR EHS Manager/UBR环境、健康和安全经理54.3Contractor Project Manager承包商项目经理54.4Contractor EHS Manager 承包商环境、健康和安全经理64.5Contractor Supervisor 承包商施工主管64.6Employee 员工65.0Procedures程序75.1Planning 计划75.2Risk Assessment & Control 风险评估及控制85.3Risk Factors in Manual Handling 人工搬运中的风险因素106.0Training培训117.0Records记录118.0Reference 参考111.0 Purpose目的The purpose of this proced

      2、ure is 该程序的目的在于-To define the minimum Health, Safety and Environment requirements relating to manual handling at UBR project jobsites and offices. 界定在UBR作场所以及办公室内执行人工搬运作业所需遵照的最低健康、安全和环境要求。2.0 Scope 范围This Standard shall be applied to all the UBR personnel, contractors and their subcontractors, Jian Li and visitors. Contractors may, however, when agreed through the UBR project engagement processes, utilize their own standards and procedures in so far as the requirements of their standards are at

      3、least equivalent to those of this Standard, those of applicable National and Beijing Local regulations which should be read and complied with in conjunction with this Standard.本标准适用于全体UBR人员、承包商及其分包商、监理和访客。然而,承包商在经过公司项目流程批准之后,可采用自身的标准和程序,但前提是此类标准和程序的要求至少与本标准相当,并符合所有适用国家和北京当地法规(需与本标准一同理解和遵照)的要求。3.0 Terms and Definitions 术语和定义Manual handling人工搬运: Human activity involving the use of muscular force to lift, move, push, pull, carry, hold or restrain any object. It is more than lifting heavy weights an

      4、d affects more than the back.人体活动,涉及使用肌肉的力量来提起、移动、推动、拉动、携带、握持或限制任何物体。其不仅仅限于提起重物,所影响的也不仅仅限于后背。Manual handling also includes the repetitive activity seen in repetitive work as well as the sustained muscle exertion required to restrain or support a load.人工搬运也包括重复工作中的重复活动,以及为限制或支撑重物肌肉持续用力。In the context of this document the term does not include the effort needed to maintain the fixed postures that occur while for example, working at a desk or driving a vehicle.在本文件中,此术语不包括维持固定姿势所作动作,如伏案工作或驾驶车辆。4.0

      5、Roles and Responsibilities岗位和职责4.1 UBR Project Director/UBR项目总监The UBR PD has the overall responsibility for this procedure and is responsible for supporting it and for ensuring that all entities at the jobsite actively participate.UBR项目总监对该程序全面负责,确保项目现场所有单位积极参与其中。The PD is responsible for providing the personnel, facilities, and other resources necessary to effectively implement this procedure.项目总监负责提供人员、设施及其它必要资源以有效执行该程序。The PD and the management team will lead by example, modelling the behavi

      6、or expected from all personnel performing work at the jobsite.项目总监和管理团队将以身作则,树立榜样。4.2 UBR EHS Manager/UBR环境、健康和安全经理The UBR EHS Manager, in conjunction with the UBR PD, is responsible for implementing and administering this procedure.UBR环境、健康和安全经理与项目总监一起负责执行和管理该程序。Function as an adjudicator on any issues from the implementation of this procedure 作为执行该程序过程中的裁定人。Audit Contractors to ensure the requirements of this procedure are implemented and will provide feedback on performance to UBR and Contrac

      7、tor Management.对承包商执行该程序要求进行审计,为UBR和承包商管理层提供反馈。Assist Contractor to plan and coordinate the work to effectively implement the requirements of the procedure.帮助承包商计划和协调工作以有效执行该程序要求。Ensure the required EHS records are generated and available for review by Management and Authorities as appropriate.确保存留台帐,为管理层和政府部门在必要的时候提供审查资料。4.3 Contractor Project Manager承包商项目经理Has the responsibility for compliance with this procedure and shall provide the personnel, facilities, and other resources necessary to eff

      8、ectively implement, administer and enforce this procedure.负责遵从该程序要求提供人员、设施和必要资源以有效执行、管理和实施该程序。Responsible for the effective dissemination and education of the requirements throughout the contractors and its subcontractors organizations. 负责在其内部和分包商中传播和教育该程序要求。Ensure that all Contractor employees and all Lower tier subcontractors comply and actively participate with its requirements.负责确保所有承包商员工和其下属分包商遵从并积极参与程序要求。4.4 Contractor EHS Manager 承包商环境、健康和安全经理Shall be responsible for the continuous monito

      9、ring of the implementation of this procedure.承包商的EHS经理将负责持续监督执行该程序。Will provide feedback on performance and assist Contractor Supervision to plan and coordinate the work to effectively implement the requirements of the procedure. 承包商的EHS经理将负责为程序执行绩效提供反馈并协助承包商管理层计划和沟通程序有效执行工作。4.5 Contractor Supervisor 承包商施工主管Shall be thoroughly familiar with this procedure and with their individual responsibilities regarding its implementation and enforcement.承包商主管必须十分清楚执行该程序的个人的职责。Shall ensure that only competent persons are assigned work tasks. This includes ensuring the worker has the skills, physique and knowledge to safely execute the work task.承包商主管必须确保有能力执行该任务的人员去完成作业,这包括确保人员具备技能、身体素质和安全执行该任务的知识。4.6 Employee 员工Must know, understand and comply with the EHS requirements of this procedure as applicable to the wor

      《项目管理 人工搬运》由会员心***分享,可在线阅读,更多相关《项目管理 人工搬运》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.