钢结构篮球馆施工组织设计方案2.doc
39页简介该工程为室内篮球馆,檐口标高为10.5m,修建面积为1260M2,结构运用年限50年,抗震布防主要性为丙类,布防烈度为7度,计划根当地动减速率0.15g,计划地动分组为第二组,园地类不为Ⅱ类,空中毛糙度B类,结构平安品级二级,耐火品级为二级,地基根底计划品级丙级,砌体施工品质操纵品级为B级主钢构梁柱钢材选用Q235B钢,屋面板采纳75mm厚950型EPS夹心板,外板为蓝色,内板为白色标高1.2000m以下为砖墙,标高1.2000m以上墙体采纳双层Q90型单板夹50mm厚保温棉,内板0.4mm,外板0.5mm,表里板均为白色钢结构篮球馆施工计划目录1施工构造计划体例阐明与工程概略···········································12施工构造计划体例原那么跟依照···········································12工程概略·························································12工期目标·······················································13工程品质目标··················································13平安目标·····················································13文化施工目标··················································132工程进度计划及资料供给········································14要紧用材·····················································14工程进度计划安排·····················································14资料供给计划·····················································143施工构造治理···························································15工程治理构造机构跟要紧施工治理职员设置·······························15施工治理预备任务·····················································16施工步队出场准备任务·················································17休息力设置·················································17机器装备设置·················································174要紧施工办法·······················································18土建施工·················································184.2构件的预制跟运输·················································184.3钢结构装置·················································244.4油漆、防火涂料的施工·················································264.5彩钢板装置·················································264.6其余工程·················································265施工进程治理·······························································27流水功课施工·················································27物质推销供给·················································27做好施工进程的和谐共同任务···········································28做好效劳任务办法·················································29做好工程资料治理办法·················································296工期、品质、平安、环保、文化施工等保障办法·····································29工期保障办法·················································29品质保障办法·················································29平安消费保障办法············································32文化施工治理办法·················································33环保治理办法·················································33平安防火治理办法············································33现场暂时施工用电治理办法·············································34工程浪费办法·················································351施工构造计划体例阐明与工程概略1.1施工构造计划体例原那么跟依照:本工程施工构造计划体例按照以下原那么:保障重点、兼顾安排,恪守投标文件的请求。
依照工程工程的内容,科学地安排施工次序,公道构造施工,确保各项施工运动紧密连接,放慢施工进度,延长工期选用进步的施工技巧,公道选择施工计划,保持品质系统并使之无效运行,确保平安消费跟进步工程品质充沛发掘跟应用机器装备才干,进步机器化水平,加重休息强度跟进步休息消费率本工程施工构造计划体例依照有:〔1〕依照淮北产业修建计划院供给的计划图纸〔2〕履行的规范、规范、规程:《修建结构荷载规范》(GB50009-2001)《钢结构计划规范》(GBJ50017-2003)《冷湾薄壁型钢结构技巧规范》(GBJ50018-2003)《钢结构工程施工品质验收规范》(GB50205-2001)《修建钢结构焊接技巧规程》(JGJ81-2001)《钢结构高强度螺栓连接的计划、施工跟验收规范》(JGJ82-91)《门式钢架、轻型屋宇、钢结构技巧规程》(CECS102:2002)《压型钢板、夹心班木屋面及墙体修建结构》〔01J925-1〕《混凝土结构计划规范》〔GB50010-2002〕《砌体结构计划规范》〔GB50007-2002〕《修建抗震计划规范》(GB50011-2001)《混凝土结构工程施工品质验收规范》(GB50204-2002)1.2工程概略:该工程为 XX省XX市年夜郭庄机场篮球馆工程,本工程檐口标高为,修建面积为1260M2,结构运用年限50年,抗震布防主要性为丙类,布防烈度为7度,计划根当地动减速率,计划地动分组为第二组,园地类不为Ⅱ类,空中毛糙度B类,结构平安品级二级,耐火品级为二级,地基根底计划品级丙级,砌体施工品质操纵品级为B级。
主钢构梁柱钢材选用Q235B钢,屋面板采纳75mm厚950型EPS夹心板,外板为蓝色,内板为白色标高以下为砖墙,标高以上墙体采纳双层Q90型单板夹50mm厚保温棉,内板,外板,表里板均为白色1.3工期目标:施工总日历工期为70天动工日期为投标人中标动工令的指定日期工程品质品级:优秀根绝重伤及以上人身伤亡事变跟电气装备平安事变的发作;确保平安文化卫生施工2工程进度计划及资料供给2.1要紧用材:钢板、钢管、锥头、螺栓球、圆钢、角钢、槽钢、C型钢、宝钢彩钢板、水泥、石子、黄沙、采光带、耐候胶、密封胶、高强螺栓、普通螺栓、自攻钉、顶丝、落水管等施工次序依照投标文件的请求,我公司构造的各施工区段内的施工次序如下:施工前期预备→土建进驻现场→放线开挖→根底施工→土方回填→根底的验收→钢构件出场→钢结构主体装置→砖墙砌筑→彩板装置→表里粉刷→空中工程→动工验收;各工序之间要尽能够最年夜限度地搭接,以保障准时实现施工任务附表一:施工进度计划表钢材、水泥等原资料的推销:在中标告诉抵达之后3天内将〔钢结构图纸须经过细化后,转换为车间消用度图〕所有原资料计划用量下发到物质推销部,由物质部一致调配,依照工程进度的安排将所有原资料备齐,钢材运至加工厂加工,现场土建施工用黄沙、石子、水泥、钢筋等运至拟建园地;临设资料、加工厂构件运至现场 现场土建施工步队于动工令下发前2天进驻施工现场,搭设暂时装备跟修建暂时路途,进展根底施工。
预制厂加工构件经检测及格后于现场装置工期计划前2天连续运至施工现场彩钢板供给:彩钢板原资料推销计划跟钢材推销计划同时下达,货源备齐后于现场钢结构主体、辅件及围护结构装置终了前一周运至施工现场,胶、钉等也同期抵达高强螺栓、普通螺栓供给计划:螺栓等装置用连接件在钢结构出场的同时,随车抵达施工现场3施工构造治理片面零碎地进展施工构造治理,实现工程树破计划跟计划请求,缭绕各阶段的施工内容,对人力、资金、资料、机器跟施工办法等进展科学公道的安排,和谐好施工中各班组各工种之间、资本与时间之间、各项资本之间的公道关联,在全部施工进程中依照客不雅施工次序及法则作出科学的公道的安排,使工程施工获得绝对最优的后果,是咱们在施工前及施工进程中需要碰到的咨询题施工构造的总体设想及施行是本工程是否保质保量定期实现的要害,它的好坏直截了当妨碍到树破单位的投资效益、计划后果以及施工单位的综合经济效益为此,我单位将配备一批施工经历丰厚、技巧水平高、明白运营、会治理、擅和谐的治理职员进展施工构造,咱们施工构造的主旨是:“效劳至上、诚信违约、平安疾速、高速优质〞为此,我单位将做好以下几多个方面的施工构造治理针对本工程的主要性及事实上际状况,我单位将把本工程作为重点工程工程来治理。
成破工程司理部,遴派施工经历丰厚、义务心强、品学兼优、素养高的治理职员跟工程技巧职员构成工程班子,全权构造工程施工,对工程工程的施工品质、平安、工期、本钱等进展有计划地构造、和谐、治理在工程司理部的根底上并辅之以我公司技巧核心、计量核心、消费调理、物质推销部的通力合作,以此确保工程准期优质地实现工程部成员年迈力衰,均有承建过年夜型工程工程的经历工程班子配备:工程司理手下装备工技巧、品质、平安、资料装备、试验测验计量、消防捍卫、环保等本能机能部分,担任该工程的施工预备、平安消费、文化施工、工程品质、计划统计、情况卫。