    • 1、1PHARMACEUTICAL ENGINEERING JANUARY/FEBRUARY 2014facilities and equipmentControlled Manufacturing Environments1JANUARY/FEBRUARY 2014 PHARMACEUTICAL ENGINEERINGEvaluation of Controlled Manufacturing Environments following an Air Handling Unit Shutdownby Catherine E. Anderson and Brian J. Lloyd, PhDThis article provides a methodology to evaluate the environmental impact of an air handling unit shutdown in a GMP manufacturing environment. E nvironmental control within the bio- pharmaceutical and me

      2、dical device industries usually involves a continual cycle of steady state activities interrupted by maintenance and recovery measures. Systems and practices, such as air tem- perature and humidity control, number of air exchanges, and room cleaning prac- tices, are in place to maintain the overall environmental control. When the environment is challenged or breached, recovery measures are in place to ensure the controlled classified area returns to the qualified state with minimal impact to the

      3、 environment and product. In many cases, the recovery measures may involve significant clean- ings, limited access, and additional environmental monitor- ing which can reduce manufacturing time and increase cost. This case study evaluated the impact of a short term breach to a biopharmaceutical controlled classified manufacturing cleanroom areas and determined how long it would take these areas to recover with minimal recovery measures and intervention.Introduction Air Handling Units (AHUs) are

      4、the primary engineering control for classified controlled environments. They provide humidity/temperature control as well as the filtration and air exchanges necessary to ensure an environment meets its classified requirements. These units must be shut down periodically to allow routine maintenance, calibration activi- ties, or planned construction. An example of the activities required to shut down a GMP AHU are listed in Table A.The average costs associated with AHU shutdowns include two to fo

      5、ur planned events annually per unit with an estimated annual cost of $2000 to $4000 per unit for parts and labor. The disruptive impact to the environment can be even longer for unplanned outages caused from mechani- cal or power failures. An average AHU also has one to two unplanned outages annually. The frequent disruption to the environment, whether planned or unplanned, can have a significant impact to production. These disruptions cause ActivityTimeAHU Shutdown (Power down)10 15 minRoutine

      6、Maintenance Work Performed30 min 4 hoursAHU Operation Resumed (Restart)15 30 minClassified Area Cleaning2 4 hoursAdditional Environmental Monitoring2 4 hoursOverall Potential DelayUp to 12 hours per AHU ShutdownTable A. Typical planned AHU shutdown activities.Reprinted from PHARMACEUTICAL ENGINEERING THE OFFICIAL TECHNICAL MAGAZINE OF ISPEJANUARY/FEBRUARY 2014, VOL 34, NO 1Copyright ISPE 2014 www.PharmaceuticalEngineering.org2JANUARY/FEBRUARY 2014 PHARMACEUTICAL ENGINEERINGfacilities and equipme

      7、ntControlled Manufacturing Environmentsdelays in the production schedule due to required area cleanings, additional environmental monitoring, and time and resources necessary to assess product impact if the envi- ronmental disruption occurred during manufacturing opera- tions. The degree of the appropriate response to an environ- mental disruption, especially a short duration of less than a few hours, is needed and data should be generated. This article presents a methodology that evaluated the

      8、impact of a temporary AHU shutdown on a classified environment and the potential for an AHU recovery period to minimize recovery efforts, specifically re-cleaning and monitoring of classified rooms. Case Study Design Along with climate control, AHUs utilize High Efficiency Particulate Air (HEPA) filters to control the level of particulates, both viable and non-viable, in the environment. An AHU shutdown increases the potential to reach or exceed allowable particulate levels in a controlled envir

      9、onment. To evalu- ate the potential impact and determine how long it takes for an area to recover with minimal intervention, a study was designed to shut down full scale AHUs for a prescribed amount of time, collect samples, then return to operation and al- low the classified environment to recover for a prescribed amount of time. Samples would be collected again following the recovery period. No additional area cleaning would be performed as part of the recovery. The intention was to utilize the study results to temporary AHU shut- downs, whether planned or unplanned.Industry Requirements Controlled environments are used to protect products from contamination by greatly reducing the probability that airborne contamination will come in contact with the product or product intermediates or components. Controlled environments are classified based upon their potential impact on product quality. The gene

      《空调系统停机风险评估》由会员jiups****uk12分享,可在线阅读,更多相关《空调系统停机风险评估》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.