    • 1、 Jack Lettiere, Jr., President Commissioner New Jersey Department of Transportation American Association of State Highway and John Horsley Transportation Officials Executive Director Executive Office: 444 N. Capitol St., N.W., Suite 249, Washington, D.C. 20001 Telephone (202) 624-5800 Telefax (202) 624-5806 Telex 49000095800 HTO ERRATA Dear Customer: Due to errors found after the publication had been completed, AASHTO has reprinted the pages listed below and made the following errata changes to

      2、the AASHTO LRFD Bridge Construction Specifications, 2nd Edition: Please substitute the original pages of text with the enclosed pages. We apologize for any inconvenience this may have caused. AASHTO Publications Staff January 2005 Replacement Pages Affected Article Errata Change p. 4-15/4-16 4.4.6 Remove extraneous bullet points from commentary column. (This is an editorial correction to clarify that there is no commentary for this article.) p. 6-11/p. 6-12 6.5.5.3 Display last row of Table 6.5.

      3、5.3-1. p. 26-11/p. 26-12 26.5.4.1 Display entire Figure 26.5.4.1-1. p. 27-5/p. 27-6 27.5.2.2 Display entire Figure 27.5.2.2-2. p. 27-11/p. 27-12 27.5.3 Display entire Figure 27.5.3-1. p. 31-7/p. 31-8 31.4.1 Display entire right column of Table 31.4.1-1. p. 31-11/p. 31-12 31.4.11.2 Correct symbols in Eq. 31.4.11.2-1. 31.4.11.3 Correct symbols in Eq. 31.4.11.3-1. 31.4.11.4 Correct symbols in Eq. 31.4.11.4-1. p. 31-15/p. 31-16 31.5.5 Remove extraneous article number from commentary column. (This is

      4、 an editorial correction to clarify that there is no commentary for this article.) p. A-21/p. A-22 Appendix Correct symbols in SI version of Eq. 31.4.11.2-1. SECTION 4: DRIVEN FOUNDATION PILES 4-15 where: Sf = settlement at failure, in. D = pile diameter or width, in. S = elastic deformation of total unsupported pile length, in. The top elevation of the test pile shall be determined immediately after driving and again just before load testing to check for heave. Any pile that heaves more than 0.

      5、25 in. (6 mm) shall be redriven or jacked to the original elevation prior to testing. Unless otherwise specified in the contract documents, a minimum three-day waiting period shall be observed between the driving of any anchor piles or the load test pile and the commencement of the load test. 4.4.5 Splicing of Piles 4.4.5.1 Steel Piles Full-length piles shall be used where practicable. If splicing is permitted, the method of splicing shall be as specified in the contract documents or as approved

      6、 by the Engineer. The arc method of welding shall be preferred when splicing steel piles. Welding shall only be performed by certified welders. 4.4.5.2 Concrete Piles Concrete piles shall not be spliced, other than to produce short extensions as permitted herein, unless specified in the contract documents or in writing by the Engineer. Short extensions or “build-ups” may be added to the tops of reinforced concrete piles to correct for unanticipated events. After the driving is completed, the con

      7、crete at the end of the pile shall be cut away, leaving the reinforcing steel exposed for a length of 40 diameters. The final cut of the concrete shall be perpendicular to the axis of the pile. Reinforcement similar to that used in the pile shall be securely fastened to the projecting steel and the necessary form work shall be placed, care being taken to prevent leakage along the pile. The concrete shall be of not less than the quality used in the pile. Just prior to placing concrete, the top of

      8、 the pile shall be thoroughly flushed with water, allowed to dry, then covered with a thin coating of neat cement, mortar, or other suitable bonding material. The forms shall remain in place not less than seven days and shall then be carefully removed and the entire exposed surface of the pile finished as previously specified. 4-16 AASHTO LRFD BRIDGE CONSTRUCTION SPECIFICATIONS 4.4.5.3 Timber Piles Timber piles shall not be spliced unless specified in the contract documents or in writing by the

      9、Engineer. 4.4.6 Defective Piles The procedure incident to the driving of piles shall not subject them to excessive and undue abuse producing crushing and spalling of the concrete, injurious splitting, splintering and brooming of the wood, or excessive deformation of the steel. Manipulation of piles to force them into proper position, considered by the Engineer to be excessive, will not be permitted. Any pile damaged by reason of internal defects, by improper driving, driven out of its proper location, or driven below the butt elevation fixed by the contract documents or by the Engineer shall be corrected at the Contractors expense by one of the following methods approved by the Engineer for

      《美国桩基规范摘录》由会员wt****50分享,可在线阅读,更多相关《美国桩基规范摘录》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.