xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计

115页
  • 卖家[上传人]:桔****
  • 文档编号:469700206
  • 上传时间:2023-03-02
  • 文档格式:DOC
  • 文档大小:1.98MB
  • / 115 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • 1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, an

      2、d ensure a successful operation, the overall goal. He and Engineering Department under the leadership of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical innovation project of the year, started and completed a series of bids and completed to date, from

      3、production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o

      4、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building mat

      5、erials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification

      6、 efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef

      7、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, empha

      8、sis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计目 录一、 编制依据41、 招标文件、设计图纸42、 主要规范、规程、标准43、 勘察报告6二、 工程概况71、 工程项目概况72、 场地工程地质、水文地质条件7三、 项目目标及重点、难点分析与对策111、 项目目标112、

      9、 重点难点分析与对策12四、 方案设计131、 支护设计方案132、 CFG桩地基处理设计153、 降水方案164、 设计说明16五、 土方挖运方案181、 施工条件与准备182、 土方挖运方案183、 马道收尾194、 出土量及挖土机械配备195、 应注意的质量问题206、 挖土安全保证措施207、 挖土环保措施20六、 总体策划与部署211、 施工总体策划212、 总体施工部署22七、 施工组织及各分项施工方案251、 施工组织计划252、 加工、材料和施工场地部署353、 施工测量364、 土钉墙施工方案385、 CFG桩施工方案406、 降水施工专项方案437、 监测方案468、 清理及移交489、 与总承包接口4810、 工程应急预案4911、 潜在事故危险性分析5212、 紧急处理措施5313、 施工过程中可能出现问题的预防措施及处理办法55八、 质量保证体系及措施561、 质量管理体系的总体要求562、 工程质量目标583、 项目质量管理体系584、 质量管理职责595、 质量管理制度606、 质量管理程序617、 质量检测设施及方法628、 确保工程质量的保证措施659 、分项工程质量保证措施71九、 施工进度计划保证措施731、 确保进度计划的组织措施732、 确保进度计划的管理措施753、 确保进度计划的技术措施774、 确保进度计划的材料与经济措施775、 施工进度计划保证措施80十、 雨季施工方案851、 总体要求852、 各分项施工具体要求853、 雨季施工防护措施86十一、 安全施工措施及环保方案911、 安全施工管理体系912、 施工现场安全管理措施943、主要分部分项工程安全技术措施984、 环保管理体系及措施1025、噪音的控制1046、消防保卫措施104十二、

      《xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计》由会员桔****分享,可在线阅读,更多相关《xi蓝汛天竺内容感知产业园项目土方、基坑支护、降水、CFG桩施工组织设计》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.