1、技 术 交 底 书 (二级) 工 程 位 置XX市XX区工 程 名 称XX工程交底工程项目墩台模板支架交 底 日 期XXXX年XX月XX日交底内容及附图一、工程概况1.1、工程概述1、工程概况XX工程施工为城市主干道,道路全长2km,南起于中山路路口,北止于建设路,规划道路红线5080m。道路沿现状道路往北,依次上跨红星路高架桥、中山二路后落地,沿着规划道路向北至建设路。另外与红星路高架桥设立体式互通一座,匝道4条(A、B、C、D匝道桥)。桥梁上部结构采用预应力混凝土现浇箱梁、钢筋混凝土箱梁、钢箱梁结构,梁高1.8m2.4m。下部结构桥墩采用门式墩、花瓶墩、柱式墩接承台桩基础。主线桥及匝道桥墩台共计103个,人行天桥承台共计12个,本工程设计墩柱类型共有17种,墩柱采用C40砼浇筑,墩台高度在3.4m20.5m之间。2、墩台结构设计XX工程桥墩通过钢筋混凝土承台与桩基相连,墩台具体构造尺寸如下:表1.1-1 墩台结构尺寸一览表序号部位技术参数砼桥墩类型墩高(m)墩顶高程(m)承台顶高程(m)C40(m3)1A匝道A0#墩单柱墩18.537.75522.23375.52A1#墩单柱墩15
2、35.47522.261553A2#墩单柱墩1132.17522.28141.64A3#墩高低墩930.14922.21843.65A4#墩单柱墩930.13521.91628.66A5#墩单柱墩930.03522.08128.67A6#墩单柱墩929.93521.98028.68A7#墩单柱墩8.529.91021.99127.39B匝道B1#墩柱式墩16.59939.40237.60256.9310B2#墩花瓶墩16.39937.49221.09259.2811B3#墩花瓶墩14.49935.60721.10853.1712B4#墩花瓶墩12.22633.44321.217124.3813B5#墩花瓶墩11.04933.16922.12076.9214B6#墩花瓶墩9.99932.36522.36632.0815B7#墩花瓶墩8.3830.75722.37737.9616B8#墩花瓶墩7.5530.00822.45825.817B9#墩花瓶墩8.7529.83721.08728.8818B10#墩花瓶墩8.6529.67221.02228.6219B11#墩柱式墩7.2529.56
3、827.76833.1820C匝道C0#墩悬挑墩6.34127.34721.00653.4221C1#墩柱式墩6.39227.51521.12332.6822C2#墩柱式墩6.54927.65821.10933.0823C3#墩花瓶墩8.49129.59721.10654.1224C4#墩花瓶墩9.26530.30421.03930.225C5#墩花瓶墩9.31730.27820.96130.3326C6#墩花瓶墩8.60229.54420.94245.5927C7#墩花瓶墩8.13229.42421.29232.7128C8#墩花瓶墩8.19229.30421.10841.4429C9#墩花瓶墩8.10729.19921.09232.6330C10#墩花瓶墩8.73629.82321.08734.6531C11#墩花瓶墩11.4531.51120.061117.2532D匝道D0#墩单柱墩6.04327.11321.79921.9333D1#墩单柱墩6.34227.20421.70622.734D2#墩单柱墩6.44227.29621.61422.9635D3#墩单柱墩6.54327
4、.39219.25530.736D4#墩单柱墩6.84227.78120.47523.9837D5#墩单柱墩7.74328.61821.17526.2938D6#墩单柱墩8.24329.66821.14927.5839D7#墩单柱墩9.74230.73521.13538.9140D8#墩单柱墩10.94231.8221.03534.541D9#墩单柱墩12.14232.8720.93537.5842D10#墩单柱墩13.24233.9221.41047.8843D11#墩单柱墩14.14234.9721.0742.7144D12#墩单柱墩15.34235.98520.86245.7845D13#墩高低墩16.04236.94720.85456.3346D14#墩单柱墩17.14137.83720.84950.447D15#墩单柱墩17.6938.5320.93951.848D16#墩单柱墩17.5438.520.87551.4249D17#墩高低墩17.1438.18821.42599.3450主线桥Z3#墩门式墩1434.338420.99391.151Z4#墩门式墩11.532.1
5、24420.87876.752Z5#墩门式墩10.630.500820.72877.453Z6#墩门式墩9.529.523220.67865.154Z7#墩门式墩8.528.145620.82859.355Z8#墩门式墩726.76820.64350.756Z9#墩门式墩5.825.390420.90543.757Z10#桥台桥台4.426.46320.696215.458东幅桥ZD0#墩桥台3.5/68.6759ZD1#墩花瓶墩5.526.46820.96823.160ZD2#墩花瓶墩7.628.33120.73130.261ZD3#墩花瓶墩9.530.19420.69443.462ZD4#墩花瓶墩1131.35320.35372.763ZD5#墩花瓶墩1535.84720.84796.764ZD6左#墩柱式墩18.839.97621.17685.165ZD6#墩花瓶墩18.839.91221.11274.766ZD6右#墩柱式墩18.839.83021.03060.567ZD7#墩门式墩19.240.37121.171246.668ZD8#墩门式墩1940.09221.092244
6、.269ZD9#墩花瓶墩1938.36219.862104.870ZD10#墩单柱墩1838.90720.90790.971ZD11#墩单柱墩1838.31420.31490.972ZD12#墩单柱墩18.838.36219.862102.473ZD13#墩门式墩20.539.27618.776126.674西幅桥XK0#墩桥台4.05/40.2875XK1#墩花瓶墩3.45124.60321.15316.6576XK2#墩花瓶墩5.99826.75320.75525.8577XK3#墩花瓶墩7.90128.95321.05331.9678XK4#墩花瓶墩11.12631.20320.07752.479XK5#墩双门式墩11.863/11.773/11.68333.103/33.013/32.92321.240121.3480XK6#墩双门式墩13.012/12.922/12.83234.615/34.525/34.43521.603131.0581XK7#墩门式墩14.154/14.05736.069/35.97221.91592.6782XK8#墩门式墩15.867/15.7737
7、.162/37.06521.295109.2983XK9#墩门式墩16.74937.93621.18748.5084XK10#墩门式墩11.138.43321.197115.8985XK11#墩门式墩9.938.74721.056110.3286XK12#墩门式墩9.939.46619.184124.88图1.1-1 花瓶墩一般构造图图1.1-2 柱式墩一般构造图图1.1-3 门式墩一般构造图图1.1-4 桥台一般构造图图1.1-5 人行天桥墩柱一般构造图1.2 桥梁墩柱施工特点分析1、施工周期长对于高空作业,模板的受力自成体系,从模板的受力性能考虑,高墩柱混凝土的一次浇筑高度一般不大于8m。对于20m左右的高墩,施工次数至少在34次以上,这样每一根墩柱的施工周期相当长,影响施工工期。2、模板和机械设备的投入大由于单根高墩柱的施工周期长,且墩柱类型多,墩柱施工采取平行作业的施工组织方法,模板的投入相当大。受起吊能力的限制,高墩柱施工需配备大吨位的吊车,导致机械设备投入也大。3、高墩柱施工定位控制难度大对于高桥墩来说,截面相对面积小、墩身高、重心高、墩身柔度大,施工精度要求高,是其显著的特点,施工时轴线很难准确控制。1.3 气象、水文、工程地质情况1、气象条件该地区降水充沛,河流纵横、湖泊密布,为场区流水地貌、湖泊地貌的发育创造了有利条件。本场区地表水体不发育。