电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

成套设备出口合同范本及说明

20页
  • 卖家[上传人]:人***
  • 文档编号:473459132
  • 上传时间:2023-05-29
  • 文档格式:DOCX
  • 文档大小:27.01KB
  • / 20 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • 1、编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页 共1页 Contract for Exporting Mining Equipment Contract No. _ This Contract is made and entered into on the 15th,Oct. in Sulaiminiyh by and between Mass Iraq Cement Co,Ltd ( as the Buyer) and China Jiangsu Grand Economic Devolpment Co.,Ltd. a company incorporated under the laws of China(hereinafter referred to as the seller). Whereas, the Buyer desires to engage the Seller to provide the Mining Equipment, all related design, technical document, technical service

      2、 and technical training and to obtain from the Seller a license of know-how and other technical information in relation with the Equipments design, erection, commissioning, operation and maintenance. Now it is hereby mutually agreed as follows: Article 1 Definitions1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article xx. 1.2 “Commissioning” means the operation of the Equipment in accordance with Article 9.4 for the purpose of carrying out Performance Test.1.3 “Contr

      3、act” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.1.4 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 16.1.1.5 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.1.6 “Erection” means the installation of the Equipment includi

      4、ng placing and connecting parts to their positions according to the design drawing.1.7 “Job Site” means the site where the Equipment shall be located and/or erected, namely Mass Iraq Cement Plant. 1.8 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached 100 percent of the total the Equipment price.1.9 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures . 1.10 “Technical Document” means the te

      5、chnical indices, specifications, drawings, manual and instructions related to the design, erection, test-run, commissioning, acceptance, operation and maintenance of the Equipment to be provided by the Seller.1.11 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller. 1.12 “Technical Training ” means the training rendered by the Seller.1.13 “Test Run” means the initial run of a single machine or the whole system of the Equipment without materials.1.1

      6、4 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 10.2, during which the Seller is responsible for the defects of the Equipment as per Article 10. Article 2 Scope of the Contract2.1 The Sellers Obligation 2.1.1 The Seller shall supply the Equipment and spare parts, provide the design, Technical Document, and conduct the Technical Service and Technical Training, and grant a non-exclusive and non-transferable right to use the know-how and other techni

      7、cal information related to the Equipments design, Erection, Commission, operation and maintenance. 2.1.2 The Seller shall procure and supply the Equipment and spare parts which is listed in Appendix , the specification is detailed in Appendix . 2.1.3 The Seller shall provide design in respect to the Equipment and submit to the Buyer the Technical Document .2.1.4 The Seller shall conduct the Technical Services at the Job Site.2.1.5 The Seller shall conduct the Technical Training of the Buyers tra

      8、inees as per Appendix .2.1.6 The Seller agrees to grant non-exclusive and non-transferable right to use the know-how, other technical information related to the Equipments design, Erection, Commission, operation and maintenance free of charge, which the Seller provides and discloses to the Buyer during the implementation of the Contract period.2.2 The Buyers Obligation2.2.1 The Buyer shall at his own costs and expenses, provide the Seller with all information and data concerning the design as pe

      9、r Appendix. The Buyer shall ensure the correctness and exactitude of all such information and data.2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delivery of the Equipment to be supplied by the Seller and transport them from port to the Job Site in time.2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run and Commissioning in accordance with the Technical Document and under the Technical Services rendered by the Seller. 2.2.4 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.Article 3 Price 3.1 The Buyer agrees to pay the total Contract price to the seller, Technical

      《成套设备出口合同范本及说明》由会员人***分享,可在线阅读,更多相关《成套设备出口合同范本及说明》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.