电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

TestPlanTemplate测试计划模板

9页
  • 卖家[上传人]:壹****1
  • 文档编号:473035126
  • 上传时间:2024-01-16
  • 文档格式:DOCX
  • 文档大小:16.25KB
  • / 9 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • 1、P09XXX Your Project NameTest Plans & Test ResultsBy: Team Member, Team Member, Team Member, Team MemberTable of contentsNote: Once you complete each of the three sections, right click on the table below and select Update Field to update the Table of Contents.)1. MSD I: WKS 8-10 PRELIMINARY TEST PLAN 31.1. Introduction; Overview; Summary; Purpose; History, etc31.2. Project Description; Sub-Systems/ Critical Components Being Tested31.3. Approval; Guide, Sponsor31.4. Test Strategy31.5. Definitions;

      2、 Important Terminology; Key Words 51.6. References52. MSD II WKS 2-3: FINAL TEST PLAN 62.1. Data Collection Plan; Sampling Plan 62.2. Measurement Capability, Equipment 82.3. Test Conditions, Setup Instructions 82.4. Sponsor/Customer, Site Related, Requests / Considerations 82.5. Test Procedure, Work Breakdown Structure, Schedule 82.6. Assumptions 83. MSD II - WKS 3-10 DESIGN TEST VERIFICATION 93.1. Test Results93.2. Logistics and Documentation93.3. Definition of a Successful Test, Pass / Fail Cr

      3、iteria93.4. Contingencies/ Mitigation for Preliminary or Insufficient Results93.5. Analysis of Data Design Summary 93.6. Conclusion or Design Summary 93.7. Function/ Performance Reviews 93.8. References103.9. Appendices10General Notes to Teams:Please remove this page from your final test plan and test results.Not all categories in this template will apply to your project. Eliminate these categories that may not apply. Also, if there are key elements not covered, please add those items.This Test

      4、Document lists the processes and categories by which you are going to verify your final design. Fundamentally, the testing needed to prove your project meets specifications. These specifications may be categorized into features, functions and performance. MSD I Timeline and MSD II Timeline on MyCourses offers a typical example of the timing of testing. You may need to modify key milestones to apply to the specific demands of your project.The plan should be understandable by an engineer not famil

      5、iar with the project.These elements can be integrated or rearranged to match project characteristics or personal/ team preferences. It may be more helpful to include traceability information (mapping of tests to specifications, customer needs, functions and features).References:http:/www.coleyconsulting.co.uk/testplan.htmhttp:/ DELETE THIS PAGE FROM YOUR PLANP098XX Your Project NameTest Plans & Test Results1. MSD I: WKS 8-10 PRELIMINARY TEST PLANNote to Teams: The Preliminary Test Plan is due at

      6、 the completion of Senior Design 1 (Week 10) and is inclusive of both the systems specifications and specifications within and between the major sub-systems. Particular attention should be paid to the interfaces between the sub-systems since different team members may be testing each. Since the chosen technologies and associated specifications are complete at the end of Senior Design 1, the test needs should be easily comprehended and documented below.1.1. Introduction; Overview; Summary; Purpos

      7、e; History, etc.Note to Team: Select the appropriate title. As an example, cut & paste information for theOne PageSummary document and apply specifically to testing of the project specifications and features.1.1.1. Add here.1.2. Project Description; Sub-Systems/ Critical Components Being TestedNote to Team: If you have a high level block diagram depicting your major sub-systems, you may want to insert here.Pick the appropriate title and or add here or remove as applicable.1.2.1. Add here.1.3. Ap

      8、proval; Guide, SponsorApproved by:Team Members - List team members.Guide - Professor Jane DoeSponsor - NASA, Charlie Simons1.4. Test StrategyNote to Teams: The important components of the Test Plan and later Final Test Plan are:1.4.1. What you ll test (and what you won t test)1.4.2. How you ll test: equipment and materials needed, test configurations and procedures, pass/fail criteria1.4.3. Responsibilities and the approval process1.4.4. Risks and contingenciesNote to Teams: These elements can b

      9、e integrated or rearranged to match project characteristics or personal/team preferences. It may be more helpful to include traceability information (mapping of tests to specifications and, if appropriate, to requirements and functions).1.4.5. Product Specifications, Block Diagram, and Pass/ Fail CriteriaNote to Teams: The structure of this test plan template is often consistent with the structure utilized for engineering specifications: for each specification or feature there is a defined test method or procedure, and pass/fail criteria to demonstrate compliance with the specification or feature. The team sdetailed Block Diagram developed during Concept Development and System Level Design is also an excellent tool to list the major interfaces to be tested.Cut & Paste the

      《TestPlanTemplate测试计划模板》由会员壹****1分享,可在线阅读,更多相关《TestPlanTemplate测试计划模板》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    监控施工 信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.