10页problems that cannot be ignored. Some leaders unwilling to do masses work, masses concept weak, on masses feelings not deep, pendulum not are with masses of relationship, think masses work is revolutionary war era of things, now obsolete has, buried business work, ignored masses work of situation compared General; some leaders not do masses work, old method regardless of with, new not with, not understand masses psychological, not understand masses wishes, not said masses language, work method simple stiff, caused masses of conflict and antipathy; some leaders can't do masses work, Faced with a lot of contradictions among the people worry about fear, panic set in encounter group events, and some are even mismanaged, inflame, so work has suffered heavy losses, and so on. These problems we are soberly aware, enhancing the party's ruling capability, the maintenance and development of the party's advanced nature and purity, and to enhance the ability of party committees and leading cadres are good people. Attach great importance to and is good at doing mass work, has become the new urgent situation strengthening the party's governing capacity-building tasks. Combined practice of maintaining flesh-and-blood ties with the masses, urged the broad masses of party members and cadres, especially all levels ... Processing to improve as a guide to the country. "" What I did is summed up these new things, be promoted. "This is a vivid manifestation of the Deng Xiaoping's mass. Deng also put people "support does not support", "agreed not to agree", "happy happy", "promise not to promise" as a starting point and destination of developing guidelines, policies, and as the only standard for measuring compliance with the wishes of the masses of the people. Under the guidance of Deng Xiaoping theory, Central Government adopted a series of important measures to strengthen links with the masses. In December 1989, the CPC Central Committee made on adhering to and perfecting the system of multi-party cooperation and political consultation under the leadership of the Chinese Communist Party, closely for CPC and the democratic parties and the relationship between the part of the masses that they contact, effectively carrying out the mass line, played a positive role. In March 1990, the 13 plenary session adopted the decision on strengthening contacts with the masses of the Party noted that "created and developed in the long struggle of the party's mass line, is to realize the party's ideological line, the fundamental political and organizational work route", can always maintain flesh-and-blood ties and development of the masses, is directly related to the rise and fall of the rise and fall of the party and State. In September 1994, 14 adopted by the plenary session of the Party on strengthening decision on several major issues of party building. The requirements of the decision of the party's leading bodies and leading cadres should develop a democratic style of work, come from the masses, to the masses, together, stick to the mass line. Party of 13 session four in the plenary yihou, to Jiang comrade for core of party国投晋城热电厂一期2×300MW烟气脱硝工程 作业指导书国投晋城热电厂一期2×300MW烟气脱硝工程C7022塔式起重机负荷试验施工作业指导书北京国电龙源环保工程有限公司二O一一年八月二十二日目 录1.原则 22.编制依据 23.试验前准备工作 24.主要技术数据 25.一般检查 26.试验 27.安全措施 48.环境管理要求 4C7022塔式起重机负荷试验方案1 原则C7022塔式起重机转场重新安装,必须进行负荷试验,以检验其技术性能是否符合要求,试验合格后方可投入使用。
C7022塔式起重机由四川建设机械(集团)股份有限公司制造,该机安装为水平臂架、小车变幅、上回转自升形式,标准臂架长55m,最大起重量16t2 编制依据《塔式起重机》 GB/T5031-2008《塔式起重机安全规程》 GB5144-2006 《C7022塔式起重机安装使用说明书》 3 试验前准备工作3.1试验场地,施工现场划分好试验区域;3.2准备好试验用的试重:16T、4.4T;3.3准备好试验用锁具钢丝绳等4 主要技术数据4.1 C7022塔式起重机臂架长55m;4.2 负荷试验作业幅度18.8~55m;4.3 负荷试验最大吊重100%;4.4 最大起吊重量16T5 一般检查5.1各机构制动器的摩擦面上不得有油污铁锈等;5.2各机构减速器箱、外啮合齿轮、轴承等润滑点润滑状况必须良好;5.3检查钢丝绳,不得有断丝、松股、波浪等情况;5.4检查塔身连接部分螺栓、回转、梯子、平台及其连接件是否紧固等;5.5对结构、机构进行检查完毕后,确认起重机处于完好状态;5.6试验环境温度-10℃-35℃,风速小于三级;5.7试验载荷的重量与其标注值误差不大于1%。
6试验6.1空载试验一般技术检查验收合格后,方可进行空负荷试验,以检验电气控制线路动作的正确性,并调整各安全限位装置准确动作6.1.1在大、小两个幅度操作主起升机构分别以快速、慢速上升下降各三次;6.1.2回转机构在允许范围内左右回转三次;6.1.3变幅机构从最小幅度到最大幅度全程变幅,增幅、减幅各三次;6.1.4起升和回转两种机构的联合动作十分钟6.2静载试验空负荷试验及调整完成后,进行静负荷试验,以检查各部各机构、机构的强度、刚度及制动的可靠性,检验起重机静态稳定性6.2.1试验内容100%静载试验:把相应于各幅度的额定载荷100%的试验载荷缓慢提升至离地面100~200mm悬吊十分钟,此时各机构不得有任何动作,各机构动作应尽量做到无冲击的起、制动;6.2.2卸载后应对各部分机构进行全面检查,不得有裂纹、永久变形、油漆剥落、连接松动等现象试验项目序号幅度(m)额定起吊重量(T)试验负荷(T)备注118.81616100%2554.44.4100%6.3动载试验静载试验合格后方可进行动载试验,试验载荷为100%的额定载荷6.3.1试验方法及要求:(1)起升机构:带载升降各三次;(2)小车牵引机构:在工作允许幅度内带载往返三次;(3)回转机构:带载左右回转360°各一次。
试验项目序号幅度(m)额定起吊重量(T)试验负荷(T)备注118.81616100%2554.44.4100%注:每次动作前,必须检查制动是否可靠,每次动作时一定要平稳6.3.2卸载后应对各部分结构进行全面检查,不应有裂纹、永久变形、油漆剥落、连接松动等现象,试验合格后方可投入使用7 安全措施7.1试验时设专人负责指挥,指挥。