好文档就是一把金锄头!
欢迎来到金锄头文库![会员中心]
电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

钻井作业英语100句.doc

7页
  • 卖家[上传人]:工****
  • 文档编号:560547459
  • 上传时间:2023-03-26
  • 文档格式:DOC
  • 文档大小:49.51KB
  • / 7 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • 钻井作业英语100句 DRILLING   OPERATION   ENGLISH   100 1、钻机已安装完毕The   rigging   up   is   finished. 2、现在开始检查和调试钻机Let's   start   to   check   and   test    the   rig.     钻机还没检查调试呢The   rig   isn't   checked   and   tested. 3、所有操作都应该按正规程序进行All   the   operation   should   be   done   per   normal   procedures. 4、不戴安全帽不许上钻台工作It   is   not   allowed   to   work   on   the   rig   floor   without   helmet   on. 5、上井架工作必须系好安全带The   safety   belt   should   be   fastened   when   working   on   the   derrick..     你系好安全带了吗? Has    your   safety   belt   been   fastened? 6、上班前不许喝酒。

      Wine   drinking   is   not   allowed   before   going   to   work. 7、大约下午1:00可以开钻Spud   in   will   begin   at   about   one   o'clock   in   the   afternoon. 8、一开采用钻速160,钻压2千磅For   the   first   spud   in   ,penetration   rate   is   160   and   weight   on the   bit   is   two   thousand   pounds.       钻速多大? What   is   the   penetration   rate?     钻压不到二千磅The   weight   on   the   bit   is   less   than   two   thousand   pounds. 9、开双泵,泵冲100,泵压6兆帕Use   both   pumps   with   100 strokes   per   minute   and   pressure   of   6   MPa.       开双泵吗?Shall   we   use   both   pumps ? 10、打完单根划眼一次,直到打完一开。

      Do   a   dummy   trip   after   single   joint   drilling   until   the   first   spud   in   finished. 11、循环一个半小时再起钻 Circulate   for   one   and   half   hours   before   pulling   out. 循环多长时间再起钻?How   long   to   circulate   before   pulling   out?       不用循环 No   need   to   circulate. 12、如有特殊情况,要马上报告Report   at   once   if   any   unusual   case   occurred. 13、下钻要控制下放速度Control   the   running   speed   when   going   in   the   hole. 14、当心顿钻和伤人Be   careful   not   to   make   free   fall   and   hurt   anyone. 15、如遇阻,不许硬压。

      Don't   force   to   run   in   with   too   more   weight   for   a   tight   hole. 遇阻了,怎么办?What   can   I   do?   The   hole   is    getting   tight.   16、观察振动筛有无跑泥浆现象See   if   any   mud   overflow   on   the   screen.      振动筛跑泥浆了   There   is   an   overflow   screen. 17、现在需要马上换筛布 We   need   to change   the   screen   at   once. 要换筛布吗? Is   the   screen   to   be   changed? 不用换筛布 The   screen   needn't    changing. 18、认真作好记录   Record   it   carefully. 19、不许作假资料 Don't   make   false   record. 这资料有假。

          It's    a    false   record. 20、每钻进100米测斜一次   Do   a   deviation   survey   every   100metre   interval. 钻多深测一次井斜?What's   the   interval   between   deviation   surveys?21、勤活动钻具   Move   the   drill   string   frequently. 22、将测斜结果及时汇报监督   The   result   of   deviation   survey   has   to   informed   to   supervisor   in   time. 已经将测斜结果报告监督了 The   supervisor   has   already   been   informed   about   the   survey   result. 23、扭矩不要过大 Don't    apply   excessive   torque. 扭矩太大   The   torque   is   excessive. 24、不许强提。

         No   forced   pulling   out   is   allowed. 25、已经提放多次,未见效果   The   string   has   been   moved   up   and   down   several   times,but   it   doesn't   work.   26、接方钻杆,倒划眼 Connect   kelly    and   do   a   backreaming. 不要接方钻杆   Don't   connect   the   kelly. 27、在钻杆上作卡点记号 Make   a   mark   for   sticking   point   on   the   drill   pipe.      在钻杆上作卡点记号了吗? Is   the   drill   pipe   marked   for   sticking   point. 28、当心扭断钻具 Be   careful   not   to   twist   off   the   drill   string. 29、未得到监督的许可,不许乱来。

      Don't   act   at   your    disposal   without   supervisor's   consent.      我事先已得到监督的同意I've   got   the   prior   consent   from   supervisor   already. 30、下钻时,不许用钻盘上扣Don't   make   up   by   rotary   table   while   running   in.      下钻时,我从来不用钻盘上扣I've   never   made   up   by   rotary   table   while   running   in. 31、用双钳紧扣Make   up   and   tighten   by   both   tongs. 32、对所有防范措施作一次检查Check   all   the   precaution   measures.      检查完毕,未发现问题Check   finished   and   no   problem   found. 33、做一次防喷演习。

      Do   a   blow   out   prevention    exercise. 34、按深度,现在快接近油气层了It   approaches    the   pay   zone   based   on   depth.      根据深度,离油气层还远呢 It   is   far   away   from   the   pay   zone   based   on   depth. 35、作好正常排量三分之一的泵压记录 Make   a   record   of   pump   pressure   at   one   third   of   normal   rate. 36、作好压井准备 Get   ready   to   kill   the   well.      有必要压井吗? Is   it   necessary   to   kill   the    well. 37、该更换刹车片了The   brake   blocks   need   to   be   changed.      要换刹车片吗?   Need   the   brake   blocks   to   be   changed? 38、每起钻20柱,要核对泥浆的升降情况。

      Check   the   fluctuation   of   mud   level   whenever   20   string   pulled   out.      有泥浆升降变化吗?Is   there   any   fluctuation   of   mud   level?       未见有升降变化 No   fluctuation   found. 39、这样下去,要扣你们的日费Your   day   rate   will    be   deducted   in   such   a   case.      为什么要扣日费?   Why   to   deduct   our   day   rate? 40、日保养时间不得超过15分钟 The   daily   maintenance   will   be   done   for   less   than   15   minutes.      15分钟之内做不完保养The   maintenance   can   not   be   done   wit。

      点击阅读更多内容
      关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
      手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
      ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.