好文档就是一把金锄头!
欢迎来到金锄头文库![会员中心]
电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

2#锅炉中部钢架安装记录.doc

6页
  • 卖家[上传人]:第***
  • 文档编号:31052981
  • 上传时间:2018-02-04
  • 文档格式:DOC
  • 文档大小:393KB
  • / 6 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • Turkey EREN (1+1) x600MW supercritical coal-fired unit projectProject quality check and acceptance record Work No.: GL-01.01.01.03Description2#锅炉中部钢架安装(钢架设备检查、安装)#2 boiler middle part steel structure (steel structure check and erection)Page 1 of 51. equipment appearance: no crack, recurrent lap, bad rust and damage.2. manufacturer’s welding joint: no entrapped slag, bubble etc.3. member material: no mistake application.4. deviation of column and beam comply with manufacturer’s technical requirement and maximum deviaition 6mm.5. deviation of column bending <1/1000 (column length) and maximum deviation 5mm.6. deviation twisting of column <1/1000 (column length) and maximum deviation 7mm, which comply with requirement. 7. deviation of beam bending and side bending: <1/1000 (column length) and maximum deviation 6mm.8. deviation of bolt hole diameter is not more than 1.5.9. deviation of bolt hole ellipticity is not more than 1.5.10. on appearance of bolt and nut, no crack, no bruise, thread complete, no dirty oil and rust etc.11. bolt, nut, washer comply with equipment technical reqirement.12. process of node friction connection surface comply with equipment technical requirement, and rust, dirty oil, dust have been cleared off, and no defects such as deformation, wrap, bend, bur etc.13. connection plates are installed in flat, correct in position, and attached with member.14. maximum misplacement between beam and column is 2mm.15. maximum deviation in parallelity between beams is 3mm.16. maximum deviation in elevation of beams is 3mm.17. maximum deviation in horizontal of beams is 3mm.18. maximum deviation in space between beams is 3mm.19. the tightening torque of steel structure node bolts comply with manufacturer’s technical requireemnt: M16 initial torque is 130N.m; final torque ends with removing of the cinquefoil head, and the prestressed torque of final tightening is 100KN. M22 initial torque is 340N.m; final torque ends with removing of the cinquefoil head, and the prestressed torque of final tightening is 190KN. M24 initial torque is 440N.m; final torque ends with removing of the cinquefoil head, and the prestressed torque of final tightening is 225KN. M27 initial torque is 670N.m; final torque is 1200 N.m, and the prestressed torque of final tightening is 290KN.CMEC NEPCNEPC NEPCTurkey EREN (1+1) x600MW supercritical coal-fired unit projectProject quality check and acceptance record Work No.: GL-01.01.01.03Description2#锅炉钢架安装(中部立柱垂直度检查)#2 boiler steel structure erection (middle part column perpendicularity check)Page 2 of 5G7G6 G4 G2G1K2K1K5K4 G42K31 G31K3G5 G35724 21 645336 73 62564 35 63 23 462334 57 424621 72 362456 6Note: deviation in perpendicularity ≤1‰ of column length and ≤15.CMEC NEPCNEPC NEPCTurkey EREN (1+1) x600MW supercritical coal-fired unit projectProject quality check and acceptance record Work No.: GL-01.01.01.03Description2#锅炉钢架安装(中部立柱对角线检查 EL41m 标高处)#2 boiler steel structure erection (middle part column diagonal check at EL41m)Page 3 of 5G7 G6K41K5K4K31G4 G2 G1G31G42G5K3K2K1 G3Note: deviation in diagonal ≤1.5‰ of diagonal length and ≤15.CMEC NEPCNEPC NEPCTurkey EREN (1+1) x600MW supercritical coal-fired unit projectProject quality check and acceptance record Work No.: GL-01.01.01.03Description2#锅炉钢架安装(中部立柱间距检查 E41m G 排)#2 boiler steel structure erection (middle part column space check at EL41m row G)Page 4 of 5K5G7G6 G4 G2K3K31K4K2K1G42 G31G5 G3G1Note: deviation in space between columns ≤1‰ of diagonal length and ≤10.CMEC NEPCNEPC NEPCTurkey EREN (1+1) x600MW supercritical coal-fired unit projectProject quality check and acceptance record Work No.: GL-01.01.01.03Description2#锅炉钢架安装(中部立柱间距检查 E41m K 排)#2 boiler steel structure erection (middle part column space check at EL41m row K)Page 5 of 5K5G7G6 G4 G2K3K31K4K2K1G42 G31G5 G3G1Note: deviation in space between columns ≤1‰ of diagonal length and ≤10.CMEC NEPCNEPC NEPC。

      点击阅读更多内容
      关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
      手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
      ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.