[优]伊拉克国立图书馆项目招标文件(中英文对照)[正式标准模板].docx
19页伊拉克国立图书馆项目招标文件(中英文对照)BIDDING DOCUMENTS FOR THE PROJECT OF NATIONAL LIBRARY伊拉克国立图书馆项目招标文件(中英文对照)中英文2.6万余字,word 文档学术交流请在评论留言TABLE OF CONTENTS 目录INSTRUCTIONS TO BIDDERS投标人须知A. General A. 一般性规定1. Scope of Bid 投标范围2. Qualification of the Bidder投标人资格3. One Bid per each bidder每个投标人只能提交一份投标书4. Cost of the bidder 投标人的费用5. Site Visit 踏勘现场6. Bidding Documents 招标文件7. Clarification of a prospective bidder requiring any clarification of the Bidding documents对潜在投标人提出的需要澄清招标文件予以澄清8. Amendment 修改C. Preparation of Bids 标书编制9. Language of Bid 标书语言10. Documents to Bid 投标文件11. Bid Prices 投标价格12. Currencies 货币13. Bid Validity 投标有效期14. Bid Security 投标保证金15. Alternative 替代方案16. Pre-Bid Meeting 标前会议17. Format and Bid Copies格式和标书份数D. Submission of Bids提交投标书18. Sealing bid 密封标书19. Deadline 截止日期20. Late Bids 延误的标书21. Modification 修改标书E. Bid Opening and Evaluation开标和评标22. Bid Opening 开标时间23. Process 处理标书24. Clarification 澄清25. Examination 审核26.Correction 勘误27. Evaluation 评标F. Award of Contract 授标28. Award 授标29. Employer's rights雇主的权利30. Notification 通知31. Signing Agreement签署协议32. Performance Security履约保函部分章节示例如下:26.Correction of Errors 26. 勘误26.1 Bids determined to be substantially responsive will be checked by the Employer for any arithmetic errors.Errors will be corrected by the Employer as follows:26.1 雇主将检查确定为具有实质性响应的投标是否存在任何算术错误。
雇主将按以下方式纠正错误:(a) where there is a discrepancy between the amounts in figures and in words, the amount in words will govern; and(a) 如果数字和文字数字之间存在差异,则以文字数字为准; 和(b) where there is a discrepancy between the unit rate and the line item total resulting from multiplying the unit rate by the quantity, the unit rate as quoted will govern, unless in the opinion of the Employer there is an obviously gross misplacement of the decimal point in the unit rate, in which case the line item total as quoted will govern and the unit rate will be corrected.(b) 如果单位费率与单项总价乘以数量而产生的差异,则以所引用的单位费率为准,除非雇主认为单位费率中的小数点存在明显的严重错位,在这种情况下,所引用的行项目总额为准并更正单位费率。
26.2 The amount stated in the bid will be adjusted by the Employer in accordance with the above procedure for the correction of errors and, with the concurrence of the bidder, shall be considered as binding upon the bidder. If the bidder does not accept the corrected amount of bid, its bid will be rejected, and the bid security may be forfeited.26.2 投标中标明的金额将由雇主根据上述错误更正程序进行调整,并在投标人同意的情况下被视为对投标人具有约束力如果投标人不接受更正的投标金额,其投标将被拒绝,投标保证金可能会被没收27. Evaluation and Comparison 27. 评估和比较27.1 The Employer will evaluate and compare only the bids determined to be substantially responsive in accordance of Bids with Clause 25.27.1 雇主将仅对根据第25 条规定的投标书确定为实质性响应的投标书进行评估和比较。
27.2 In evaluating the bids, the Employer will determine for each bid the Evaluated Bid Price by adjusting the Bid Price as follows:27.2 在评标时,雇主将通过如下调整投标价格来确定每个投标的投标价格评估:a) making any correction for errors pursuant to Clause 26;a) 根据第 26 条对错误进行更正;b) excluding Provisional Sums and the provision, if any, for Contingencies in the Summary Bill of Quantities, but including Daywork, where priced competitively;b) 不包括临时金额和总工程量清单中的应急准备金(如有),但包括价格具有竞争力的计日工;c) making an appropriate adjustment on sound technical and/or financial grounds for any other quantifiable acceptable variations, deviations or alternative offers; andc) 基于合理的技术和/或财务理由对任何其他可量化的可接受变化、偏差或替代报价进行适当调整;和d) making an allowance for varying times for completion offered by bidders, if different from that specified in the Bidding Documents and in the manner decided by the Employer.d) 如果投标人提供的竣工时间与招标文件中规定的时间不同,以雇主决定的方式投标人提供的发生变化的竣工时间做出宽容度。
27.3 The Employer reserves the right to accept or reject any variation, deviation, or alternative offer. Variations, deviations, alternative offers, and other factors that are in excess of the requirements of the bidding documents shall not be taken into account in bid evaluation.27.3 雇主保留接受或拒绝任何变更、偏差或替代提议的权利超出招标文件要求的变动、偏差、替代报价等因素在评标时不予考虑27.4 If the bid, which results in the lowest Evaluated Bid Price, is seriously unbalanced or front loaded in relation to the Engineer's estimate of the items of work to be performed under the contract, the Employer may require the bidder to produce detailed price analyses for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, taking into consideration the schedule of estimated contract payments, the Employer may require that the amount of the performance security set forth in the Appendix to Bid be increased at the expense of the bidder to a level sufficient to protect the Employer against financial loss in the event of default of the successful bidder under the contract.27.4 如果导致最低评估投标价的投标严重不平衡或系与工程师对要实施的工程项目的估计有关的前装,雇主可以要求投标人提供工程量清单中的任何或所有项目详细的价格分析,以证明这些价格与建议的施工方法和时间表的内部一致性。
在对价格分析进行评估后,考虑到预计。