好文档就是一把金锄头!
欢迎来到金锄头文库![会员中心]
电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

项目管理课后题及答案5.docx

3页
  • 卖家[上传人]:拖***
  • 文档编号:290483761
  • 上传时间:2022-05-09
  • 文档格式:DOCX
  • 文档大小:16.36KB
  • / 3 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • 本文格式为Word版,下载可任意编辑项目管理课后题及答案5 第五章 Chapter Review Questions 1. The procurement phase precedes the design phase since it involves the bidding and award of architect service. True or false?F 购买阶段之前的设计阶段,由于它涉及到建筑服务的招投标和赏赐 2. The feasibility stage of a project requires heavy owner involvement. True or false?T 一个工程的可行性研究阶段需要大量的业主参与 3. It is imperative for project success that the feasibility, design, procurement, construction, turnover, and operation stages described in this chapter occur in linear fashion. That is , no stage proceed without the prior stage being completed. True or false? T 当务之急是工程告成的可行性研究,设计,这一章中所描述的购买,施工,营业额,经营阶段发生的以线性方式。

      也就是说,没有舞台没有举行事先阶段已经完成 4. Project design typically proceeds as follows: programming, design development, schematic, and construction documents. True or false?F 工程设计一般过程如下:规划,设计开发,原理图和施工文件 5. As interest rates increase, income in future years become more valuable in offsetting up-front construction costs. True or false? F 随着利率的上升,收入在未来几年中抵消变得更有价值的前期创办本金 6. Advertising for subcontractors, review of subcontractors’ bids, and awarding of contracts occurs during which project phase? a a. Procurement b. Construction c. Design d. Turnover e. Feasibility 7. As-built drawing, warranties, guarantees, and operation manuals are all provide to the owner during which project phase? d a. b. c. d. e. Feasibility analysis Design Construction Turnover Procurement 8. The production of drawing and specifications occurs in which project phase? b a. b. c. d. e. Feasibility analysis Design Construction Turnover Procurement 9. Which of the following are considered in determining the feasibility of a project? e a. b. c. d. e. Cost of money Estimated cost Market demand Project timing All of the above 10. The design of project system occurs during which of the following design phase? c a. b. c. d. e. Programming Schematic Design development Construction documents None of the above — 3 —。

      点击阅读更多内容
      关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
      手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
      ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.