好文档就是一把金锄头!
欢迎来到金锄头文库![会员中心]
电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

SMART: The First Licensed Advanced Integral Reactor.pdf

9页
  • 卖家[上传人]:li45****605
  • 文档编号:26338807
  • 上传时间:2017-12-25
  • 文档格式:PDF
  • 文档大小:2.42MB
  • / 9 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • Journal ofEnergy and Power Engineering 8(2014)94·102 SMART:The First Licensed Advanced I nteg ral Reactor Keung Koo Kim,Wonj ae Lee,Shun Choi,Hark Rho Kim and Jaej oo Ha Korea Atomic Energy Research Institute,Daeduckdaero 989-,1 1,Yuseongku,Daejeon 305—353,Korea Received:April 23,2013/Accepted:August 12,2013/Published:January 3 1,2014 Abstract:SMART fsystem.integrated modular advanced reactor)is a smal1.sized advanced integral reactor with a rated thermal power of 330 MW.It can produce l 00 MW of electricity or 90 MW of electricity and 40,000 t of desalinated water concurrently,which is sufficient for l 00.000 residents.SMART technology is a sensible mixture of new innovative design features and proven technologies through a PWR.The enhancement of safety and reliability is realized by incorporating inherent safety features and reliable passive safety systems.The improvement in the economics is achieved through system simplification.component modularization,construction time reduction.and increased plant availability.AI1 technologies and design features implemented into SMART have been proven in industries and/or qualified through the SMART design verification program including comprehensive test and experiments.The full scope of the safety analyses carried out to confirm that the inherent safety—improvement design characteristics and safety systems of SMART ensure reactor safety.After a thorough licensing review,SDA(standard design approva1)for SMART was granted on July 4th, 20 l 2 bv the Korea NSSC(Nuclear Safety and Security Commission).This marks the first license for an integral-type reactor in the world.This paper presents the SMART characteristics safety features and technology validation.The licensing process of SMART is also described. Key words:SMR,advanced technology,passive safety system,technology validation,standard design,SMART 1.Intr0ductiOn After nuclear power generation became established in the 1 950s,the size of reactor units has grown from 60 MWe to more than 1,600 MWe,with corresponding economies of scale during operation.Most nuclear power plants currently available on the market are large-sized plants requiring a large initial investment and a long construction period.Therefore,only a select number of countries can afford to utilize nuclear energy. However,most countries operate small—sized power plants for their electricity supply.and 96.5%of the 1 27,000 power plants currently operating in the world are under 300 MWe[1].These countries can not deploy large-sized nuclear power plants partly owing to the high capital cost and small electricity grids[2】. Therefore,several countries including Korea have Corresp0nding author:Keung Koo Kim,SMART Project Manager,research fields:SMR design and reactor dynamic analysis.E—mail:kkkim@kaeri.re.kr. entered into a race to develop small-sized reactors that can be built independently or as modules within a larger complex,with capacity added incrementally as required.The economies of scale are provided by the numbers produced.Small units are seen as a much more manageable investment than large ones.The KAERI(Korea Atomic Energy Research Institute) started developing SMART in 1 997,aiming to export it to countries with small electric grids and water supply issues[3,4】. SMART is a small—sized integral type PWR with a rated thermal power of 330 MWt,which adopts a sensible mixture of new innovative design features and proven technologies aimed at achieving highly enhanced safety and improved economics.The design features contributing to safety enhancement are basically inherent safety improvement and passive safety features.Economic improvement features include system simplification, component modularization, on.shop fabrication and site SMART:The First Licensed Advanced Integral Reactor installation and other features reducing the construction time. Advanced design features implemented into SMART should be proven or qualified through experience,testing,or analysis,and if possible,the equipment should be designed according to the applicable approved standards.For the last 1 5 years.SMART—specific design methodologies and a computer code system have been built together through a series of validation experiments and equipment verifications.From 2009 to 20 1 2,the SMART Technology Validation and the Standard Design Approval Project were carried out.After one and half years of intensive licensing review.the SDA f0r SMART was officially issued on July 4th.20 1 2 bv the NSSC.in compliance with Article l 2 ofthe Nuclear Safety Act.This is the first license for an integral reactor in the world. 2.SMART Design Goal From the beginning stage of the SMART development,top—level requirements for safety and economics were imposed for the SMART design features as shown in Table 1.Salty enhancement and economic improvement are the most important considerations.The safety requirements of SMART were top-tiered based on the core damage frequency per reactor year,which。

      点击阅读更多内容
      相关文档
      局长在2025年全市医疗保障重点工作调度会暨定点医药机构违法违规使用医保基金自查自纠工作推进会上的讲话稿.docx 2025年春教体系统安全工作会上的讲话范文.docx 2024年度街道机关支部党组织书记述职发言材料供参考.docx 2025年干部谈心谈话内容范文.docx 主管发改部门党组书记在党委理论学习中心组学习研讨会上的发言材料供参考.docx 学习关于党的建设的重要思想交流发言材料供参考.docx 纪委书记2025年全面从严治党的研讨材料范文.docx 2025年春季防汛防旱工作部署会上的讲话范文.docx 2025年村“三资”管理工作计划供参考.docx 村“两委”2025年工作计划供参考.docx 乡镇在全市履行职责事项清单工作会议上的交流发言.docx 银行行长在学习2025年一号文件精神专题会上的研讨发言供参考.docx 乡党委乡村振兴工作经验总结供参考.docx 党组书记、主任在2025年展改革委民营企业座谈会上的讲话范文.docx 领导干部在2025年“纪检监察工作规范化法治化正规化建设年”行动动员部署会议上的讲话范文.docx 关于落实全面从严治党主体责任报告范文.docx 在2025年基层履行职责事项清单工作会议上的交流发言例文.docx 2025年理论学习中心组党风廉政建设专题学习研讨会议上的交流发言供参考.docx 在理论学习中心组推动经济社会高质量发展专题学习研讨会议上的交流发言两篇.docx 党支部2024年民主评议党员工作情况报告供参考.docx
      关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
      手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
      ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.