好文档就是一把金锄头!
欢迎来到金锄头文库![会员中心]
电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

毕马威经典24、36题.doc

11页
  • 卖家[上传人]:第***
  • 文档编号:31502399
  • 上传时间:2018-02-08
  • 文档格式:DOC
  • 文档大小:687KB
  • / 11 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • KPMG 经典 24 题The classical 24 numerical reasoning 经典的 24 数值推理一.bar chart below shows the number of temporary and permanent staff working in five regional call centres: 1. the actual number of calls taken per hour in region sw fell 10% short of the target set – what was the target number of calls per hour? E(28x200+25x100)/(100%-10%)=9000 2. an increase of 6% in both the number of temporary and permanent staff in region NW is planned. If the average number of calls taken per hour stayed the same for all staff, what would be the increase in the total number of calls taken per hour?C。

      20x250+16x300) x6%=5883.if the ratio of permanent to temporary staff in region SE was the same as for region E, but the total number of staff remained the same, what would be the change in calls handled per hour? BRegion E (permanent: temporary)=3:2Region SE Total: 400 ,Permanent: 150 Temporary: 250(New) Permanent: 400x3/5=240 , Temporary: 400x2/5=160所以我们可以得出 P 增加了 90 人,T 减少了 90 人90x(30-18)=1080 (我们可以用其他方法算,但是却不是最节约时间的算法)4.which two regions had the highest total number of calls handed per hour by permanent staff?E 目测, (SE 和 SW 的 P 每小时接的数是最高的,而且 SW 的 P 的人数多,所以总数上 SW 可定比 SE 要高。

      虽然 E 的每小时接数不高,但是他人数最多,所以总数也很高)二.table below shows coach travel limited’s ticket prices and sales targets to three destinations over a 4-week period: destination average price 4-week sales week 1 week 2per ticket target revenue revenuehopworth 48 43200 11232 12096jumpford 50 80000 21600 19200skipdown 40 16000 4160 46405. if the combined sales target to all three destinations over the current period in creased by 5%,what is the total amount of revenue that remains to be earned by the end of this four-week period in order to meet the target ? C(43200+80000+16000) x105%-11232-12096-21600-19200-4160-4640=732326. for the next four-week period ,the intention is to sell 120 tickets to skipdown per week at the same average pared to the current four-week period,by what percentage would the revenue target for skipdown increase? A(40x120x4-1600)/16000=20%7. how many fewer tickets to hopworth would need to be sold if the average ticket price was increased to 50 GBP and the sales target was to increase to 44,000 GPB? A43200/48-44000/50=208. if 25 seater coaches are used on the jumpford route and all tickets on these coaches were sold , how many coach journeys would need to made during the four-week period to reach the sales target? D80000/50/25=64三.The table below shows the commuter population and number of train users for new city:june july aug sept octtotal number of commuters(millions) 3.2 2.4 2.2 2.5 3.2total number of commuters by train(millions) 1.4 1.08 0.88 1.1 1.7commuters using metro train services(%) 20 20 10 15 15Note: metro train user levels are based up on a proportion of those who commute using all train services.9. assuming the percentage growth trends in total commuters and train commuters between July and September were applied to the period between September an November,what would be the number of non-train commuters in november?E(2.50-2.40)/2.40x2.50+2.50=2.604(1.10-1.08)/1.08x1.10+1.10=1.1202.604-1.120=1.4810. in October how many fewer people were non-train commuters compared to train commuters? A1.70-(3.20-1.70)=0.211. if the number of rail commuters in November fell by 0.3 million compared to October , how many rail commuters did not use metro train services if rail commuter usage of metro train services was 15%?C(1.70-0.3)x(1-15%)=1.1912.what percentage of communters traveled by train during July but did not use metro train services? E1.08x(1-20%)/2.40=36%四.the chart and figures below show a factory’s productivity report over sixteen weeks, divided into 4 equal 4-week periods: 13.what was the difference in units produces between periods 1 and 2, if no overtime was worked?G(70-50)x4x40x3=960014. during period 2 employees worked an average of 4 hours overtime per week , in addition to their standard 40 hours per week . what was the total pay bill for that period?B50x40x4x6+50x4x4x10=5600015. if during period 4 productivity fell to 2.4 units per person per hour , by how many would the workforce have to be increased by so as not to affect the total output for that period?E3/2.4x40-40=1016. the factory is considering cutting the working week to 38 hours. If they had done this for periods 3 and 4 , how many fewer units would have been produced, if no overtime were worked?C(40-38)x4x3x(55+40)=2280五.the table below shows the currency rates in operation for two successive years 17. a travelller buys 8000 thai baht in year 1 , and then year 2 converts some of this amount to 100 euros and the remainder into GBP, what is the amount converted into GBP?C8000/61.8-100/1.62=67.7218. if 1000 GBP of euros were purchased in year 1, what would be their approximate value in hong kong dollars when exchanged in year 2?F1000x1.52/1.62x11.1=1041519, between year 1 and year 2, what was the approximate change in value (expressed as a per。

      点击阅读更多内容
      关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
      手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
      ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.