电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本

水汽分析取样装置说明书(英文)

12页
  • 卖家[上传人]:jiups****uk12
  • 文档编号:90984013
  • 上传时间:2019-06-20
  • 文档格式:DOC
  • 文档大小:228.01KB
  • / 12 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • 1、 GRAND POWER Water and Steam Integrated Sampling Unit INSTRUCTION Model: CXD JILIN CITY GRAND POWER EQUIPMENT CO., LTD. GRAND POWER 光大电力 I. Summary This unit is adapted to pre-treatment the sample of water and steam for chemical analysis of thermo-equipment, manual sampling, on-line quality analysis of water and steam, computer supervising of the checked parameters. This unit composes of three basic sections: CXD series Sampling Unit of Chemical analysis, which functions in pre-treatment, manual

      2、 sampling, providing eligible sample for on-line chemical analysis; Analysis instrument screen, on which installs on-line chemical analysis instrument and record displayer etc.; Computer control system, which functions in data collection, treatment, display, reports print, supervising, and epigynous computer control communication etc. Clients can select part of the unit or select all according to demand. II. CXD series sampling unit of chemical analysis 1. Technical characteristic Using a total

      3、complete new techno-route, this unit acquires outstanding benefit that other sampling units cannot match, either domestic or overseas. In detail, the characteristics are as below: (1) The sampling unit adopts high-efficiency temperature-pressure reductor (with patent) for fluid of high-temperature and high-pressure. When fluid of high-temperature and high-pressure (such as water, steam etc.), flows along this unit, the temperature and pressure will be reduced, that is the unit works with double

      4、functions, one is as the cooler of traditional sampling unit, the other is as the reductor. (2) The sampling unit is not set with pressure-only reductor, which puts an end to the traditional disadvantage caused by reductor block resulted in too much maintenance. (3) The sample flows along the high-efficiency temperature-pressure reductor in a status of deep puffing, with high heat-exchange efficiency. Under the same condition, the usage of the cooling water is only 1/2 2/3 that of the existing c

      5、ooler. (4) The sample flows along the pipes of the high-efficiency temperature-pressure reductor with speediness that helps the wall of pipes self-clean. (5) The sampling unit adopts a new-type filter, pole-style filter (with patent), barring mechanical impurity granule with diameter over 1.4mm without changing the composition of the water sample basically. Pole-style filter can self-clean for the large flux of the sample, block-proof, if need be, the exhaust drainage valve can be started to cle

      6、an the filter. The pole-style filter is solid and durable, exempt from maintenance. (6) The sampling unit has a compact structure occupying little space, for example, ten-point of sampling unit is 2.5m long, 0.65m wide, and 1.6m high, every point of sampling added, only 0.2m longer needed, without changing of width and height, therefore, the occupying area is only 3/5 of the current sampling unit. 2. Working conditions (1) Temperature of the environment:540 (2) Power supply: 230V10%,50Hz, 2KVA (

      7、3) Cooling water: A: Temperature: 0.2MPa C: Flux: subject to the number and the temperature of sampling points, fifteen points of sampling designed according to 30T/h D: The cooling water of the temperature-pressure reductor adopts de-salted water, without rot, dirt or pollute. 3. Main technical index (1) Under the condition of the temperature not higher than 560 and the pressure not bigger than 35Mpa, the temperature of the treated water is about that of the cooling water plus 5(1 GRAND POWER 光

      8、大电力 ), the pressure is smaller than 0.3Mpa. (2) The flux of water sample: 1500ml/min (3) Temperature of the outlet water can be set an alarming rating by the round detector by which the max absolute error measured should not be higher/lower than 1. Any exceeding of the alarm value will cause automatic alarming. The normal alarm is set at 4050. (4) Pressure safety valve of the outlet water sample is set at 0.62.8Mpa, adjustable. Inlet of cooling water has pressure-overloading alarm, with lowest s

      9、etting at 0.2MPa and highest setting at 0.8MPa. 4. Formal dimensions Seventeen-points sampling unit is 3.6m long, 0.65m wide and 1.60m high. 5. Debugging procedure 5.1. Preparation before operation 5.1.1. According to the system diagram, be familiar with the positions and functions of all sections for the sampling unit. 5.1.2. Regulate the pressure limits on the contacts of cooling water, and check the alarm system if normal. (1) Set the pressure meter on the contacts of the inlet cooling water pipe with a limit at 0.2MPa0.8MPa. (2) Set the pressure meter on the contacts of the outlet cooling water pipe with a limit at 0MPa, and the pressure difference to the inlet not lower than 0.2MPa 5.1.3. Power on the round detector, set the sampling cycle and alarm values according to Instruction settings. (1) Max. value of alarm is set at 4045 (2) Min. value of alarm is set at 0 5.1.4. Check the nodes, airproof parts, fastening parts of the sampling un

      《水汽分析取样装置说明书(英文)》由会员jiups****uk12分享,可在线阅读,更多相关《水汽分析取样装置说明书(英文)》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2 2022年小学体育教师学期工作总结 2022年家长会心得体会集合15篇
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.