某深基坑降水(轻型井点)施工组织设计-secret

5页
  • 卖家[上传人]:jiups****uk12
  • 文档编号:90670069
  • 上传时间:2019-06-14
  • 文档格式:DOC
  • 文档大小:77.04KB
  • / 5 举报 版权申诉 马上下载
  • 文本预览
  • 下载提示
  • 常见问题
    • 1、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in

      2、accordance with law. Deepening the information management to ensure full communication zero resistance. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system hand

      3、over; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic

      4、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage

      5、, and energy-saving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve according to law, standardize and fair. Innovation of performance man

      6、agement, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels

      7、cadres in enterprise development in the深基坑降水工程施工组织设计二00六年二月二十四日目 录轻型井点一、 工程概况二、 施工条件三、 施工方案四、 施工方法及质量措施五、 平面布置及剖面图一、工程概况二、 施工条件沟槽自然地面,施工现场地平面平整,且面层无坚硬的石块,道渣砖块等垃圾,地下无障碍物,挖好,以便施工冲孔。三、 施工方案1、 井点选择:坞室地下连续墙先施工时,需先开挖一条大约1m深的沟槽,需采用轻型井点配合连续墙沟槽降水,降低地下水位负1.5至2m左右,以充分发挥连续墙顺利施工,现拟以地下连续墙施工前,沟槽两边采用双排井点降水,使沟槽两边的水位不能渗透沟槽内,待坞室地下连续墙作业全部结束后,在坞室坞首深基坑开挖前,坞室及坞首地下连续墙四周外边离50cm再布置轻型井点降水,连续墙外边需降至-4m左右深度,减少墙外对基坑内压力,同时-3m至4m左右走向为粉土层及粉砂,粉土渗透系数大,本工程降水宜用一级降水系统。2、 根据一级轻型井点降水,为了要达到要挖的深度及挤压力为-3m至-4m左右,需把井点支管埋置在5-6米的深度,同时缩短总管的延长,

      8、提高吸水真空扬程距离,这样就达到了一级基坑开挖的深度。3、 坞室连续墙全长464米,宽139.9米,合计周长1207米,坞首长大约140米,宽大约40米,合计周长360米,坞室坞首共计周长1567米,坞室连续墙开挖沟槽时,需沟槽降低水位时,沟槽两边需布置双排井点降水,每套轻型井点延长为60米,坞室坞首连续墙施工时,共布置52套轻型井点降水配合地下连续墙施工,在降水施工中,先布置一段轻型井点降水给连续墙施工,待地下连续墙作业做好一段后,再继续布置后一段轻型井点给连续墙施工,以此类推,等坞室地下连续墙施工完毕,坞室地下连续墙沟槽布置井点全部拆除,再布置连续墙墙外边井点降水,坞室连续墙周长1207米,每套为延长60米,共20套降水设备,坞首连续墙周长360米,每套为延长60米,共6套降水设备,降低水位,减少基坑外边对深基坑内挤压力,待坞室、坞首深基坑内承台底板浇筑好,待养护10天左右,连续墙外边轻型井点全部拆除。4、 在井点打好正常运转后,根据日出水量情况,一般情况2至3天,连续墙沟槽可进行试开挖,开挖沟槽连续墙施工时,其两边井点继续降水,待连续墙做好一段,井点拆除一段,继布置后一段井点。5

      9、、 沟槽土层渗透系数大,从集水总管尺寸考虑,按总管的1.5m间距进行埋设,基总管的标高按放在自然土平面上。6、 主要机械设备根据施工顺序,设计工程量及现场用水、用电等综合考虑本工程,计划连续墙施工时进轻型井点10套设备,至连续墙施工结束后,在深基坑连续墙墙外施工打井点时,再进降水设备10套,共计进场20套轻型井点降水设备。四、 主要施工及质量措施1、 施工顺序面层碎石清理开挖沟槽水冲法冲孔埋设井点管连接总管安装抽水设备机组试抽水。2、 冲孔直径不小于15mm,深度比滤管底深500mm,以上是多余深度尺寸填深粗砂。3、 井点降水施工完毕后,应立即进行试抽,合格后每根井管从井口到下0.5m-1m用粘土填塞。4、 在井点正常运转后,将采取人员进行管理,检查机组运转,施工打井时有施工队长保持与甲方联络。五、 平面布置及剖面图见后面附图仿佛顷刻间,亚运就来到了我们身边。一个普通的人,很难想象它背后隐藏着多少人的心血,藏匿着多少人的汗水,背负着多少人的梦想,寄托了多少人的祝愿,在这个激动人心的时刻,在这个万众瞩目的地方of backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve independent Commission against corruption work level, strengthening on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safe

      《某深基坑降水(轻型井点)施工组织设计-secret》由会员jiups****uk12分享,可在线阅读,更多相关《某深基坑降水(轻型井点)施工组织设计-secret》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2 2022年小学体育教师学期工作总结 2022年家长会心得体会集合15篇
     
    收藏店铺
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.