    • 1、 亨氏(中国)佛山市一期婴儿米粉项目Heinz Project MustangQuality Control Plan质量控制计划(Rev:02)四川省第六建筑有限公司No. 6 Construction Company of Sichuan Province2013.05.05Table of Content 目录1 General Description概述2 Quality Control Target质量控制目标3 Quality Control Principle质量控制原则4 Quality Control Basis质量控制的依据5 Quality Control Organization 质量控制组织构架6 Construction Quality Control Procedure 施工质量控制程序6.1 General Quality Control Flow Chart总质量控制流程6.2 Material & Equipments Procurement Procedure材料设备的采购程序6.3 Mockups模型样板6.4 Construction Qual

      2、ity Control Inspection Procedure施工质量控制验收程序6.5 NCR Procedure不符合项整改程序6.6 Material & Equipments Delivery and storage材料设备的进场及存放6.7 Inspection and Test Plan检验、试验计划6.8 Finished Products Protection 成品保护7 Construction Quality Control Documents施工质量文件8 Subcontractor Management分包管理1 General Description概述This quality control plan is used for Heinz Project Mustang for GC and GCs subcontractors construction quality control. To make sure all work can be performed per procedures and based on drawings, codes/sta

      3、ndards and Clients requirements.本质量控制计划适用于亨氏野马项目总包及总包分包的施工质量控制,确保所有工作在遵守图纸、规范/标准、甲方的要求的基础上按程序进行。2 Quality Control Target质量控制目标2.1 Comply with design drawings, standard & Codes满足设计图纸、国家规范、标准的要求2.2 Meet general contract and Clients requirements满足总包合同及甲方的要求2.3 First Pass for Inspection and Acceptance争取一次性验收合格2.4 Try to build a good project争创优质工程3 Quality Control Principle质量控制原则3.1 Control before happening事前控制3.1.1 Quality Control Contents质量控制内容l Know well quality control skills and codes/standards

      4、before construction commencement掌握和熟悉质量控制的技术,掌握有关技术文件规范。l Inspection subcontractors certificates施工队伍的资质检查。l Material and equipments procurement technical review and procurement plan before purchasing工程所需的原材料、半成品、购配件的质量控制。l Inspecting tools and instruments施工队伍的计量器具的检查。l Inspecting construction machines and equipments施工队伍所使用机械的检查。l Inspecting subcontractors staff certificates施工队伍管理人员资质和上岗证明书的检查。l Work methods statement submittal and review before specific work start单项工作开始前的施工方案的提交及审查。3.1.2 Technic

      5、al disclosure技术交底3.1.2.1 Disclosure shall be done by the project technical department to the engineering department, then by the engineering department to the construction teams management; the engineering department shall supervise for the disclosure by the management of construction teams to the operators.由项目技术部向工程部交底,工程部向施工队管理层交底,并监督施工队管理层向其操作层交底。3.1.2.2 Disclosure meeting shall be organized for important project sections and sub-items by the technical department, and Heinz/Stellar and Jianli

      6、 shall be invited for the solicitation of their opinions; a meeting minute shall be formed after thorough discussion of construction procedures and details by all participants, so as to bring the whole construction process under effective preemptive control.重要分部分项工程由技术部组织交底会,邀请Heinz/Stellar及监理参加,并征求其意见,与会各方就有关施工工序及细节做认真讨论,并形成会议纪要,使整个施工过程处于有效的预控之中。3.1.2.3 The technical disclosure shall be carried out in such a manner that every member in the project management and operation understand the process

      7、 methods and quality requirements of the construction of the project section/items within their responsibility scope.技术交底要做到使项目所有管理层及操作层的人员明确了解分部分项工程施工中各自责任范围内的过程施工方法和质量要求。3.1.2.4 Technical disclosure of construction teams shall be supervised and inspected by project technical department, once every half month, the results of which to be reported to the technical responsible person.施工队技术交底由项目技术部监督检查,每半月检查一次,并将检查结果报技术负责人。3.2 Dynamic Management and Tracing during Progress动态管理及过程跟踪3.2.1 Process con

      8、trol before commencement开工前过程控制3.2.1.1 The project technical department shall be responsible for the preparation plan before commencement, which shall account for human, machine, materials, time limit and other factors.项目技术部负责编制开工前准备计划,计划应全面考虑人、机、料及时间等因素。3.2.1.2 Upon receipt of drawings, an internal joint drawing examination by the engineering, quality departments shall be organized by the technical department, chaired by the technical responsible person.接到图纸后,技术部组织,由技术负责人主持,由工程部、质量部,进行图纸内部会审。3.

      9、2.1.3 Practical and feasible construction plan and quality plan shall be prepared in line with the characteristics of the construction stage, section and sub-items.根据施工阶段、分部、分项工程的特点,编制切实可行的施工方案和质量计划。3.2.2 Construction process control施工的过程控制3.2.2.1 Construction process control施工过程工序控制Control construction process and tracing construction progress. And no next work can start before upper work inspected and accepted by Stellar/Jianli. After upper work finished, self-inspection should be done by subcontractors or GC, if pass the inspection, then request Stellar/Jianli to inspect. 工序把关、过程跟踪。坚持上道工序不经检查、验收不准进行下道工序的施工。上道工序完成后,先由施工单位进行自检、专职检查,验收合格后,申请Stellar/监理单位检查验收。3.2.2.2 Process Tracing Chart工序过程跟踪框

      《质量控制计划(中英文版,封面可多用)》由会员jiups****uk12分享,可在线阅读,更多相关《质量控制计划(中英文版,封面可多用)》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2 2022年小学体育教师学期工作总结
     
    收藏店铺
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.