    • 1、工程项目实施控制 PROJECT CONTROLLING,1、控制的任务 在管理学中(管理控制论),控制包括提出问题、研究问题、计划、控制、监督、反馈等工作内容。实质上它已包括了一个完整的管理全过程,是广义的控制。 此处的控制指在计划阶段后对项目实施阶段的控制工作,即实施控制,它与计划一起形成一个有机的项目管理过程。项目实施控制的总任务是保证按预定的计划实施项目,保证项目总目标的圆满实现。,一、概述,2、实施控制的必要性,项目管理主要采用目标管理方法。目标是控制的灵魂,没有控制,目标和计划无法实现; 现代工程项目计划实施的难度大; 项目的顺利实施需要各参与方在时间、空间上协调一致; 项目计划是在许多假设条件基础上的预先安排,实施过程中存在各种干扰。,理论轨迹 实际轨迹,It is impossible at the onset of a new project to foresee all problems or to anticipate all changes that the project might need. Still, every effort is made thro

      2、ughout the project to regulate work, minimize changes to the plan, and guide the project toward pre-established performance, cost, and schedule objectives.,What is control Control is the process of monitoring activities to ensure that they are being accomplished as planned and of correcting any significant deviations.,The control process In general, the process is achieved in three phases: (1) setting performance standards, (2) comparing these standards with actual performance, then (3) taking n

      3、ecessary corrective action. Planning and control are interrelated.,Planning concentrates on setting goals and directions; control guides the work toward those goals. Planning allocates resources; control ensures effective, ongoing utilization of those resources. Planning anticipates problems; control corrects the problems. Planning motivates participants to achieve goals; control rewards achievement of goals.,Anticipates problems,Corrects Problems after they occur,Corrects Problems as they happe

      4、n,Types of Control,Input,Processes,Output,Feed Forward Control,Concurrent Control,Feedback Control,3、控制的类型,4、控制的内容 目标控制 合同控制 风险控制 变更管理及形象管理,四控两管一协调,Project control emphasis In project control, the emphasis is on scope, quality, schedule, and cost. Scope change control A change in project scope is an alternation to the original, agreed-upon scope statement defined in the project plan and specified in the WBS. Projects have a natural tendency to grow over time because of changes and additions in t

      5、he scope, a phenomenon called “creep scope”.,The aim of scope change control is to identify where changes have occurred, ensure the changes are necessary and/or beneficial, contain or delimit the changes wherever possible, and manage the implementation of changes.,Quality control Quality control is synonymous with ability to conform to the requirements of the end-item and work processes and procedures. Quality control is managing the work to achieve the desired requirements and specifications, t

      6、aking preventive measures to keep errors and mistakes out of the work process, and determining and eliminating the sources of errors and mistakes as they occur.,A variety of methods are employed for testing and inspection to eliminate defects and ensure that end-items satisfy requirements. Tests and inspections should be on-going so that problems or defects are identified as early as possible. In general, the earlier in the development cycle that problems are found, the less costly it is to reme

      7、dy them.,Schedule control The intent of schedule control is to keep the project on schedule and minimize schedule overruns. One cause of project schedule overruns is poor planning and, especially, poor definition and time estimating. Other, more controllable, causes of schedule overruns are:,(1) Multitasking. Working on many tasks or projects dissipates focused energy, causing some tasks to be delayed. (2) Procrastination. Given a choice between two scheduled times, one early and one late, the h

      8、uman tendency is to wait until the late time to begin. (3) Task variability. In projects, the effect of early tasks and late tasks on the project schedule do not average out, and it is only the late tasks that count.,Cost control Cost control tracks expenditures versus budgets to detect variances. It seeks to eliminate unauthorized or inappropriate expenditures, and to minimize or contain cost changes. Cost control is accomplished at both the work-package level and the project level.,定义项目目标的文件,如

      9、项目建议书、可行性研究报告、项目任务书、合同文件等 适用的法律、法规 各种计划文件、合同分析文件 变更文件,5、控制的依据,6、项目控制过程,计划目标值(投资目标、进度目标、质量目标),4. 比较计划值与实际值 测量器,5. 偏差,调节器 6. 采取控制措施,3. 收集实际数据,工程进展,人力,物力,财力,无,1. 投入,实际值,(实际支出 实际进展 质量检查的数据),2.干扰,有,7、工程项目实施前导工作 各种许可证的办理 建设用地规划许可证 建设工程规划许可证 施工许可证 现场准备 实施条件准备,二、进度控制 1、进度的概念 综合的含义 将工期与工程实物、成本、劳动消耗、资源统一起来。 进度指标 持续时间 按工程活动的结果状态数量描述 已完成工程的价值量 资源消耗指标,2、进度控制的过程 按计划实施并记录 各控制期末与计划对比,评价进度状况 调整进度,预测新的工期状况 评审新计划,是否满足目标要求,3、进度拖延的原因和解决措施 可以采取的赶工措施 增加资源投入 重新分配资源 减少工作范围,包括减少工作量或删去一些工作包 改善工器具以提高劳动效率 提高劳动生产率 将部分任务转移 改变网络计划中工程活动的逻辑关系 将一些工作包合并 修改实施方案,三、成本控制 1、成本控制的特点 积极性与责任形式(合同形式及承担的风险) 成本控制的综合性(成本模型的缺点、“挣得值Earned Value” ) 控制周期不可太长(成本控制时间区段的划分),“挣值法”(Earned Value Technique) 基本参数: BCWS (Budgeted Cost of Work Scheduled) BCWP (Budgeted Cost of Work Performed) ACWP (Actual Cost of Work Performed),BCWS (Budgeted Cost of Work Scheduled): measures What is Planned in terms of budget cost of the work that should take place (i.e., according to the baseline schedule of the

      《武汉理工《工程项目管理》考研幻灯片-工程项目实施控制》由会员F****n分享,可在线阅读,更多相关《武汉理工《工程项目管理》考研幻灯片-工程项目实施控制》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2 2022年小学体育教师学期工作总结 2022年家长会心得体会集合15篇
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.