    • 1、Quality & Satisfy,深圳德信诚经济咨询有限公司,公司地址:东莞市长安镇图书馆左侧电梯四楼 邮政编码: 523850 HTTP:/ E-MAIL: TEL: 0769-85092880 FAX: 0769-89026070,Process Capability Analysis,(Measure Phase),Scope of Module,Process Variation Process Capability Specification, Process and Control Limits Process Potential vs Process Performance Short-Term vs Long-Term Process Capability Process Capability for Non-Normal Data Cycle-Time (Exponential Distribution) Reject Rate (Binomial Distribution) Defect Rate (Poisson Distribution),Process Va

      2、riation,Process Variation is the inevitable differences among individual measurements or units produced by a process. Sources of Variation within unit (positional variation) between units (unit-unit variation) between lots (lot-lot variation) between lines (line-line variation) across time (time-time variation) measurement error (repeatability & reproducibility),Types of Variation,Inherent or Natural Variation Due to the cumulative effect of many small unavoidable causes A process operating with

      3、 only chance causes of variation present is said to be “in statistical control”,Types of Variation,Special or Assignable Variation May be due to a) improperly adjusted machine b) operator error c) defective raw material A process operating in the presence of assignable causes of variation is said to be “out-of-control”,Process Capability,Process Capability is the inherent reproducibility of a processs output. It measures how well the process is currently behaving with respect to the output speci

      4、fications. It refers to the uniformity of the process. Capability is often thought of in terms of the proportion of output that will be within product specification tolerances. The frequency of defectives produced may be measured in a) percentage (%) b) parts per million (ppm) c) parts per billion (ppb),Process Capability,Process Capability studies can indicate the consistency of the process output indicate the degree to which the output meets specifications be used for comparison with another p

      5、rocess or competitor,Process Capability vs Specification Limits,a),b),c),a) Process is highly capable b) Process is marginally capable c) Process is not capable,Three Types of Limits,Specification Limits (LSL and USL) created by design engineering in response to customer requirements to specify the tolerance for a products characteristic Process Limits (LPL and UPL) measures the variation of a process the natural 6 limits of the measured characteristic Control Limits (LCL and UCL) measures the v

      6、ariation of a sample statistic (mean, variance, proportion, etc),Three Types of Limits,Distribution of Individual Values Distribution of Sample Averages,Process Capability Indices,Two measures of process capability Process Potential Cp Process Performance Cpu Cpl Cpk,Process Potential,The Cp index assesses whether the natural tolerance (6) of a process is within the specification limits.,Process Potential,A Cp of 1.0 indicates that a process is judged to be “capable”, i.e. if the process is cent

      7、ered within its engineering tolerance, 0.27% of parts produced will be beyond specification limits. Cp Reject Rate 1.00 0.270 % 1.33 0.007 % 1.50 6.8 ppm 2.00 2.0 ppb,Process Potential,a),b),c),a) Process is highly capable (Cp2) b) Process is capable (Cp=1 to 2) c) Process is not capable (Cp1),Process Potential,The Cp index compares the allowable spread (USL-LSL) against the process spread (6). It fails to take into account if the process is not centered between the specification limits.,Process

      8、 is centered,Process is not centered,Process Performance,The Cpk index relates the scaled distance between the process mean and the nearest specification limit.,Process Performance,Cpk Reject Rate 1.0 0.13 0.27 % 1.1 0.05 0.10 % 1.2 0.02 0.03 % 1.3 48.1 96.2 ppm 1.4 13.4 26.7 ppm 1.5 3.4 6.8 ppm 1.6 794 1589 ppb 1.7 170 340 ppb 1.8 33 67 ppb 1.9 6 12 ppb 2.0 1 2 ppb,Process Performance,a) Process is highly capable (Cpk1.5) b) Process is capable (Cpk=1 to 1.5) c) Process is not capable (Cpk1),Exa

      9、mple 1,Specification Limits : 4 to 16 g Machine Mean Std Dev (a) 10 4 (b) 10 2 (c) 7 2 (d) 13 1 Determine the corresponding Cp and Cpk for each machine.,Example 1A,Example 1B,Example 1C,Example 1D,Process Capability,For a normally distributed characteristic, the defective rate F(x) may be estimated via the following: For characteristics with only one specification limit: a) LSL only b) USL only,LSL,USL,Example 2,Specification Limits : 4 to 16 g Machine Mean Std Dev (a) 10 4 (b) 10 2 (c) 7 2 (d) 13 1 Determine the defective rate for each machine.,Example 2,Mean Std Dev ZLSL ZUSL F(xUSL) F(x) 10 4 -1.5 1.5 66,807 66,807 133,614 10 2 -3.0 3.0 1,350 1,350 2,700 7 2 -1.5 4.5 66,807 3 66,811 13 1 -9.0 3.0 0 1,350 1,350,Lower Spec Limit = 4 g Upper Spec Limit =

      《培训教材英文版》由会员F****n分享,可在线阅读,更多相关《培训教材英文版》请在金锄头文库上搜索。

      点击阅读更多内容
    最新标签
    信息化课堂中的合作学习结业作业七年级语文 发车时刻表 长途客运 入党志愿书填写模板精品 庆祝建党101周年多体裁诗歌朗诵素材汇编10篇唯一微庆祝 智能家居系统本科论文 心得感悟 雁楠中学 20230513224122 2022 公安主题党日 部编版四年级第三单元综合性学习课件 机关事务中心2022年全面依法治区工作总结及来年工作安排 入党积极分子自我推荐 世界水日ppt 关于构建更高水平的全民健身公共服务体系的意见 空气单元分析 哈里德课件 2022年乡村振兴驻村工作计划 空气教材分析 五年级下册科学教材分析 退役军人事务局季度工作总结 集装箱房合同 2021年财务报表 2022年继续教育公需课 2022年公需课 2022年日历每月一张 名词性从句在写作中的应用 局域网技术与局域网组建 施工网格 薪资体系 运维实施方案 硫酸安全技术 柔韧训练 既有居住建筑节能改造技术规程 建筑工地疫情防控 大型工程技术风险 磷酸二氢钾 2022年小学三年级语文下册教学总结例文 少儿美术-小花 2022年环保倡议书模板六篇 2022年监理辞职报告精选 2022年畅想未来记叙文精品 企业信息化建设与管理课程实验指导书范本 草房子读后感-第1篇 小数乘整数教学PPT课件人教版五年级数学上册 2022年教师个人工作计划范本-工作计划 国学小名士经典诵读电视大赛观后感诵读经典传承美德 医疗质量管理制度 2 2022年小学体育教师学期工作总结
    关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
    手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
    ©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.