FailureMode&EffectAnalysis2
19页1、Failure Mode & Effect Analysis,Explanation and Use of FMEA,What is FMEA?,FMEA is a problem solving process adopted by Snap-on as a key component of the Quality Forward System. Generally, FMEA is done by an on-site multifunctional team facilitated locally or by an SEQ Group Advanced Quality Engineer. Objective is to identify all of the reasons why quality of a process or product does not meet expectations. Uses severity, occurrence and detection ratings to determine corrective action priority for
2、 each possible failure reason.,When should a FMEA study be conducted?,As part of a Design/Development phase. When corrective action is needed due to unfavorable performance data (performance based on QFS metrics does not meet goals). When a need to make incremental improvement is identified by facility management or the SEQ Group.,FMEA Team Start-Up,Team Selection done by local quality coordinator, business unit manager or, on request, SEQ Group Advanced Quality Engineer. Problem Statement A con
3、cise and focused description of the quality problem or opportunity for improvement, “what went wrong” or “what needs fixing”. Goal Statement a description of what is to be accomplished by the team, in quantifiable terms “reduce by”, “increase by”, “eliminate”, etc. Good metrics to use include scrap cost, rework cost, or Defects Per Million Opportunities (DPMO), etc. For example, a goal statement could be “To reduce DPMO on product family X from 3000 to 2000 by year end”. Complete FMEA Team Start
4、-Up Worksheet (example located in procedure SEQ 80.10, Figure 1).,Problem Statement & Goal Statement,Problem Statement and Goal Statement should consider: What went wrong? What is the gap between the desired quality level and the actual quality level? Which process or processes are involved? Which department or cell is the deficiency occurring in? Is the problem cyclic, can it be attributed to specific events? What are the appropriate metrics to measure? What is the impact on operational fitness
5、 and profitability? What is the impact on the bottom line (reduced, increased, eliminated)? Are there constraints recognized early in the process? If so, have they been explored and clarified with the appropriate management level,FMEA Process,FMEAs uncover process problems related to the manufacture of product. Examples: a piece of automated assembly equipment may misfeed parts resulting in products not being assembled correctly, or, in a chemical manufacturing process, temperature or mixing tim
《FailureMode&EffectAnalysis2》由会员j****s分享,可在线阅读,更多相关《FailureMode&EffectAnalysis2》请在金锄头文库上搜索。
研究报告-2016-2022年中国数控矫直机床行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国众筹行业市场全景评估及发展趋势预测报告(目录)
2017-2022年中国干细胞医疗行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国3D电视市场评估及投资前景预测报告(目录)
2016-2022年中国智慧商圈行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国PBT纤维行业市场全景评估及发展趋势预测报告(目录)
2017-2022年中国锰矿行业市场全景评估及发展趋势预测报告(目录)
研究报告-2016-2022年中国制氧机行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国水务行业市场全景评估及发展趋势预测报告(目录)
研究报告-2016-2022年中国机械行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国避孕药市场评估及投资前景预测报告目录
2016-2022年中国竹制包装用品行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国网络直播行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国BBQ市场评估及投资前景预测报告(目录)
2016-2022年中国LED行业市场全景评估及发展趋势预测报告(目录)
2017-2022年中国平板电脑行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国提净塔行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国月子中心行业市场全景评估及发展趋势预测报告(目录)
2016-2022年中国钛白粉行业市场研究及发展前景预测报告(目录)
2017年中国风电行业发展趋势及装机容量预测
2023-11-14 7页
2023-02-28 15页
2023-02-20 60页
2023-02-20 52页
2023-01-31 8页
2022-12-27 23页
2022-11-29 36页
2022-11-28 41页
2022-11-16 26页
2022-11-09 71页