浙江臻泰建设有限公司浦阳镇机埠河整治工程施工组织设计2标
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of浦阳镇桃源机埠河整治工程施工组织设计浙江臻泰建设有限公司2012年11月15日目 录第1章 、工程概况第2章 、编制依据第3章 、施工总平面布置及施工组织第4章 、主要工程施工方法第5章 、质量管理体系与措施第6章 、安全管理体系与措施第7章 、环境保护管理体系与措施第8章 、工程进度计划与措施第9章 、资源配备计划第10章 、文明施工措施第11章 、附图第一章工程概况1.1工程概况内容桃源机埠河位于杭州市萧山区浦阳镇境内。本次整治河道起点为桃源机埠(桩号为JBH 0+000),终点为上横塘(桩号为JBH 3+009),主河道整治长度为3009m。桩号JBH0+000至桩号SJH0+660段设计河底高程为2.50m(高程为85国家高程基准,下同), 桩号JBH0+660至桩号SJH3+009段设计河底高程为1.80m。本工程建设内容为:护岸、清淤、河埠、垃圾房、涵管及农田机耕桥。桩号JBH 2+458 至桩号JBH 2+926段左岸新建松木桩护岸,桩号JBH2+931 JBH3+009段(除桥梁连接段)新建干砌块石条石挡墙,桥梁两侧及渐变段采用新建浆砌块石挡墙,其余段均为新建干砌块石挡墙;河道全线清淤;新建河埠80处,新建垃圾房30处,新建C20砼DN500排水涵管15处,共30节,新建DN800排水涵管15处,共30节,每处节数可根据实际情况调整。新建农田机耕桥两座,分别位于桃源机埠河JBH2+926及支河桩号0+100处,净跨均为10m。垃圾房、河埠、排水涵管位置由业主根据实际情况确定。本河道设计常水位4.2m,新建干砌块石挡墙压顶高程为4.70m,挡墙基础为40cm厚C20砼灌砌块石底板,底板顶面高程为3.20m。松木桩顶高程为4.20m,稍径10cm,长3m,5根/m布置。1.2、交通条件本工程位于萧山区南部,三通一平已经完成,浦阳镇桃源机埠河两岸有现成的机耕道路通往外界,交通条件方便,能够满足施工车辆进出场及物料运输的要求。1.3、合同工期本标段工程合同工期总数 120日历天,开标时间为2012年11月15日,若我公司中标。我公司计划开工时间2012年11月28日,以总监理工程师签发的合同工程开工令为准,2013年3月底竣工。1.4、工程质量质量标准:合格(符合工程施工质量验收规范标准)。质量要求:合格第二章编制依据2.1编制依据2.1.1 杭州市萧山区浦阳镇桃源机埠河整治工程招标文件2.1.2 杭州市萧山区浦阳镇桃源机埠河整治工程施工图纸2.1.3 建设工程工程量清单计价规范GB50500-20082.1.4 浙江省建设工程工程量清单计价指引2.1.5 浙江省建设工程计价规则(2010版)2.1.6 浙江省建筑工程预算定额(2010版)2.1.7 浙江省安装工程预算定额(2010版)2.1.8 浙江省仿古建筑与园林绿化工程预算定额(2010版)2.1.9 浙江省建设工程施工取费定额(2010版)2.1.10浙江省水利水电建筑工程预算定额(2010版)2.1.11浙江省水利水电施工机械台班费用定额(2010版) 2.1.12 浙江省水利水电工程设计概(预)算编制规定(2010)2.1.13 杭州市建设工程工程量清单计价实施细则2.1.14 杭州市建设工程造价信息(萧山区)2012年第6期(未列材料执行杭州相应信息价)2.1.15 浙江造价信息2012年第9期(未列材料执行前几期信息价)2.1.16 相关技术标准与规范1.测量规范(GBJ50026-93)2.地基与基础工程施工及验收规范(GBJ202-83)3.水利水电建设工程验收规程SL223-2008; 4.水利水电工程施工质量评定规程SL176-20075.混凝土结构工程施工质量验收规范(GB50204-2002)6.建筑地基基础工程施工质量验收规范GB502022002;7.城市桥梁工程施工与质量验收标准(CJJ2-2008)8.建筑地地面工程施工质量验收规范(GB-2002)9.建筑工程施工质量验收评定统一标准(GB50300-2001)10.堤防工程施工质量评定与验收规范(试行)SL239-199911.砌体工程施工质量