目目录录1.0 GENERAL 概述概述.12.0 ORGANIZE BASIS 编制依据编制依据.33.0 APPLICABLE SCOPE 适用范围适用范围.84.0 QUALITY TARGET 质量目标质量目标.85.0 QUALITY MANAGEMENT SYSTEM 质量管理体系质量管理体系.96.0 QUALITY RESPONSIBILITY 质量管理职责质量管理职责.117.0SITE ENGINEERING 设计控制设计控制. 188.0 DOCUMENT CONTROL 文件控制文件控制.189.0 MATERIAL CONTROL 材料控制材料控制.2110.0QUALITY CONTROL PROCEDURE 质量控制程序质量控制程序. 3011.0 STEPS/DESCRIPTION 步骤步骤/方法说明方法说明.42112.0CONTROL OF EQUIPMENT INSPECTION, INVESTIGATION AND TESTING 检检验、测量和试验设备的控制验、测量和试验设备的控制.4313.0 RECORD FOR PERSONNEL 员工记录员工记录.4314.0 AUDIT/ SURVEILLANCE 质量审查质量审查/巡检巡检. 4815.0 MASTER PIECE PROGRAM 样板工程程序样板工程程序.48中中国石化集团国石化集团南京工程有限南京工程有限公司公司第第 1页页1.0 General 概述概述1.1Description 工程说明GAA project is a new project of BYC IPS, as the owner of BASFT-Yangtze chemicallimited corp., Superior is Yangtze Petrochemical Engineering Surveillance CompanyLimited, SNEI as a construction party. Construction scope: Process piping,equipment installation (Rotating Equipm ent equipment, static equipment, storagetank prefabrication and installation), steel structure, anti-corrosion insulation,electrical instrument 扬巴精丙烯酸项目为新建装置,业主为扬子石化-巴斯夫有限责任公司,CTN 为项目施工管理组,监理单位为南京扬子石化工程监理有限责任公司,施工方为中石化南京工程有限责任公司,施工范围为:工艺管道、设备安装(动设备、静设备、储罐预制安装) 、钢结构、防腐保温、电气仪表。In order to meet the requirement of engineer management, GAA project managementteam has organized project quality plan for BYC GAA project. This plan for BYCGAA project has a detail description on adjustment of job responsibility and workprocedure.为适应扬巴精丙烯酸项目工程管理的需要, 中石化南京工程有限责任公司扬巴精丙烯酸项目部编制了合同质量计划。本扬巴精丙烯酸项目合同质量计划对工作职责的调整、工作程序的变化有关要求做了相应的描述。1.2Distribution of contract workscope 合同工作内容分解No. 序号Work item 工作名称Main participat ion 参与主 体Work place 工作场所remark 备注1Rotating/staticequipm ent,storage tank and steel storage tank and steel structure pipe rack in stallation by contractor in work scope.工作范围中 规定的应由承包商施工设备 (动设备、静设备、储罐预 制)钢结构安装SNEIGAAsite GAA 现场中中国石化集团国石化集团南京工程有限南京工程有限公司公司第第 2页页2Pricess pinping spiilp refabricating and etectin by contractor in work scope. 工作范围中规定的应由承包商 施工的工艺管线预制安装SNEIGAAsite GAA 现场3Fire Flighting piping and equipm entinstallation constructed by contractor in work scope 工作范围中规定的 应由承包商施工的消防管线及 设施安装SNEIGAAsite GAA 现场4Electrical and telecom communicaeion in seallation 工作范围中规定的应由承包商 施工的电气、电信安装SNEIGAAsite GAA 现场5In strum entsystem in stallation 工作范围中规定 的应由承包商施工仪表安装SNEIGAAsite GAA 现场6All discipline materials supplied by contractor, such as civil, underground pipe, warm and ventilation, electrical, plot plan.土建、 地下管道、暖通、电气、总图 等专业工程中按照供货范围划 分属于承包商供货的所有材料Suppliers of qualified 合格材料供 应商Production companyof material 各 材料生产单 位Materials supplier qualification sshallbe checked by CTN then procured 材料供应商资 质由 CTN 审查 合格后方采购7NDI inspection 管线无损检测Third party 第三方检测公 司Third party physical and chemical lab 第三方检测公 司理化实验室Third party shall be evaluated and approved by project.第三 方检测单位需 由项目公司评 价并批准1.3 contract quality communications 合同质量通讯Contractor:Nanjing Chemical construction CO. LTD中中国石化集团国石化集团南京工程有限南京工程有限公司公司第第 3页页承 包 商:中石化南京工程有限公司ADD: 地址:南京市栖霞区马群科技园马群大道 3 号联 系 人:肖中山职务:质量经理电话:18251895573传真:025-87117850电子邮件:102532644qq.comContact:Xiao ZhongshanTitle:QA/QC ManagerTelephone: 18251895573Fax: 025-87117850Email:102532644qq.com2.0 Organize basis 编制依据编制依据2.1.Contruction contract and related appendix 项目合同及相关合同附件。2.2.ISO9001:2000Qualitymanagementsystem-requirementsGB/T19002-1994.idtISO9002 : 1994Qualitymanagementsystem,production,safety,andserviceISO9001:2000 质量管理体系要求 GB/T19002-1994.idt ISO9002: 1994质量管理体系、生产、安全和服务的质量管理模式 。2.4. Construction drawings provided by WorleyParsons. WorleyParsons 提供的施工图纸。2.5 Execution standard and code 国家现行有关施工规范、标准;2.6SNET: QG/SE18.01-2010Quality brochure and Quality system procedure;中国石化集团南京工程公司:QG/SE18.01-2010质量手册和 QG/SE18.02-2010 等质量体系程序文件 ;2.7SNEI: HSE management system 中国石化集团南京工程公司:HSE 管理体系文件;2.8SNEI: Corporate sy