电子文档交易市场
安卓APP | ios版本
电子文档交易市场
安卓APP | ios版本
换一换
首页 金锄头文库 > 资源分类 > DOC文档下载
分享到微信 分享到微博 分享到QQ空间

【施工组织设计】重庆某轻轨高架车站施工组织设计(清水混凝土)

  • 资源ID:321839895       资源大小:1.34MB        全文页数:84页
  • 资源格式: DOC        下载积分:5金贝
快捷下载 游客一键下载
账号登录下载
微信登录下载
三方登录下载: 微信开放平台登录   支付宝登录   QQ登录  
二维码
微信扫一扫登录
下载资源需要5金贝
邮箱/手机:
温馨提示:
快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
如填写123,账号就是123,密码也是123。
支付方式: 支付宝    微信支付   
验证码:   换一换

 
账号:
密码:
验证码:   换一换
  忘记密码?
    
1、金锄头文库是“C2C”交易模式,即卖家上传的文档直接由买家下载,本站只是中间服务平台,本站所有文档下载所得的收益全部归上传人(卖家)所有,作为网络服务商,若您的权利被侵害请及时联系右侧客服;
2、如你看到网页展示的文档有jinchutou.com水印,是因预览和防盗链等技术需要对部份页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有jinchutou.com水印标识,下载后原文更清晰;
3、所有的PPT和DOC文档都被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;下载前须认真查看,确认无误后再购买;
4、文档大部份都是可以预览的,金锄头文库作为内容存储提供商,无法对各卖家所售文档的真实性、完整性、准确性以及专业性等问题提供审核和保证,请慎重购买;
5、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据;
6、如果您还有什么不清楚的或需要我们协助,可以点击右侧栏的客服。
下载须知 | 常见问题汇总

【施工组织设计】重庆某轻轨高架车站施工组织设计(清水混凝土)

编制依据1. 重庆市*轻轨站工程建筑、结构、安装设计图纸(2009年6月、B版)2. 建设工程项目管理规范GB/50326-20013. 建筑工程清水混凝土施工技术规范(DB11/T464-2007)4. 混凝土外加剂应用技术规程(DBJ01-61-2002)5. 建筑地基基础工程施工质量验收规范GB50202-20026. 普通混凝土配合比设计规程(JGJ55-2000)7. 工程测量规范GB50026-968. 混凝土结构工程施工质量验收规范GB50204-20029. 砌体工程施工质量验收规范GB50203-200210. 建筑装饰装修工程质量验收规范GB50210-200111. 建筑给水排水及采暖工程施工质量验收规范GB50242-200212. 建筑电气工程施工质量验收规范GB50303-200213. 钢筋机械连接通用技术规程JGJ107-9614. 钢筋焊接及验收规范JGJ18-200115. 建筑施工扣件式钢管脚手架安全技术规范JGJ130-200116. 西南地区现行建筑标准设计通用图17. 建筑工程大模板技术规程(JGJ74-2003)18. 混凝土结构施工图平面整体表示方法制图规则和构造详图(03G101) 目 录编制依据 ·························································2第一章 工程概况 ··················································· 41、工程建设基本概况·················································· 42、工程地质及自然条件概述··········································· 43、工程设计概况······················································ 54、现场施工条件······················································ 55、主要分部分项工程量·················································56、工程特点、难点、重点···············································6第二章 施工组织与部署················································71、管理目标 ··························································72、施工组织机构·······················································73、施工部署···························································9第三章 施工准备及资源配置计划········································111、施工准备···························································122、各种资源配置计划···················································12第四章 施工进度计划··················································141、总工期···························································· 142、施工各节点计划及说明·············································· 143、工期保证措施·······················································14第五章 施工平面布置·················································151 、平面布置原则······················································152、现场平面布置及说明·················································153、现场布置图·························································16第六章 主要施工方案·················································161、清水混凝土系统施工方案·············································162、钢筋工程施工方案 ················································· 603、外脚手架施工方案·················································· 724、砌体工程·························································· 77第七章 工程质量保证措施·············································811、质量保证体系框图···················································822、保证质量奖罚办法···················································833、加强施工检测·······················································834、工程质量验收·······················································835、施工阶段性的质量控制措施···········································84第八章 工期保证措施·················································841、组织管理措施·······················································842、过程管理措施·······················································843、 施工进度计划的管理················································844、物资供应保证·······················································84第九章 安全文明施工措施·············································851、安全目标···························································852、安全保证体系·······················································853、安全生产策划·······················································864、管理制度···························································87第一章 工程概况1、工程建设基本概况1建设单位2建设地点3建筑面积6817.954层数变电所设备层、站厅层、站台板下夹层、站台层共四层5建筑高程本工程±0.000相当于绝对标高为225.758m6结构形式钢筋混凝土框架结构7设计年限及等级使用年限100结构安全等级一级抗震等级三级抗震设防烈度六度建筑重要性一级耐火等级一级8混凝土等级C25、C30、C509钢筋等级HPB235、HRB33510主要构件截面尺寸()墙300梁500*1400、2200*1800柱1400*1800板120、1502、工程地质及自然条件概述 2.1、地形地貌及地层岩性根据重庆市勘测院*车站岩土工程详细勘察报告,场地地处长江南岸岸坡中上部,原始地貌属河谷侵蚀斜坡沟谷地貌。岩层呈单斜产出,区内无断层,地质构造简单。场地内沿途层序正常,无滑坡、崩塌、危岩等地质现象,场地稳定,适宜建设本工程。 2.2、气象车站范围内的气象特征具有空气湿润,春早夏长,冬暖多雾、秋雨绵绵的特点,年无霜期349天左右。据市气象局资料:勘察区多年平均气温18.3°C,月平均最高气温是8月为28.1°C,月平均最低气温在1月为5.7°C,日最高气温43.5°C,日最低气温-1.8°C;多年平均降水量1082.6mm左右,降雨多集中在59月,其降雨量最高达746.1 mm左右,多年平均日最大降雨量122.9mm,日降雨量大于25mm以上的大暴雨日数占全年降雨日数的62%左右,小时最大降雨量可达62.1mm。湿度:多年平均相对湿度约79%,绝对湿度17.1Hpa左右。风向:主要风向为北风,全年平均风速为1.3m/s左右,最大风速为26.1mm。 2.3、水文 本场地为丘陵斜坡地貌,临近长江河谷岸坡,地表水系不发育,地表水排泄畅通,水文地质条件简单。场地地下水可分为松散层空隙水和基岩裂隙水,由大气降水补给,基岩裂隙水以脉状或网形似储存,本场地以砂质泥岩为主,裂隙不发育,基岩裂隙水量小。根据*长江大桥*立交工程在钻孔内采集的水样水质分析成果,本场地地下水对混凝土无腐蚀性。 2.4、地震效应 根据建筑抗震设计规范(GB50011-2001),拟建场地抗震设防烈度为6度,设计基本地震加速度值为0.05g。 2.5、不良地质现象 本车站场地地质条件较好,在拟建场地范围未发现断层、滑坡、软弱夹层等不良地质现象。3、工程设计概况 3.1、建筑设计概况 本工程为地上高架四层侧式曲线车站,包括地面一层(变电所设备层)、二层(站厅层)、三层(站台板下层)、四层(站台层),车站中线总长120.578m,上行线站台有效长度120m,下行线站台有效长度为122.976m,车站标准段宽14.8m(不含外挂扶梯和平台宽度),总建筑面积6817.95m。车站高程:车站为平坡,轨顶高程为233.558m,一层高程为219.758m,二层为225.758m,三层为231,258m,四层为234.608m。建筑重要性等级为一级,防火等级为一级,

注意事项

本文(【施工组织设计】重庆某轻轨高架车站施工组织设计(清水混凝土))为本站会员(凌云****90)主动上传,金锄头文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即阅读金锄头文库的“版权提示”【网址:https://www.jinchutou.com/h-59.html】,按提示上传提交保证函及证明材料,经审查核实后我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




关于金锄头网 - 版权申诉 - 免责声明 - 诚邀英才 - 联系我们
手机版 | 川公网安备 51140202000112号 | 经营许可证(蜀ICP备13022795号)
©2008-2016 by Sichuan Goldhoe Inc. All Rights Reserved.