【施工组织设计】回风斜井井筒施工组织设计
云南滇东能源有限责任公司白龙山煤矿C7+8煤层底板回风大巷掘进工程施工组织设计浙江中宇实业发展有限公司年 月 日目 录前言············································51 编制依据和原则······························61. 1 编制依据 ································61. 2 编制的指导思想和原则····················82 工程概况····································112. 1 矿井概况·································122. 2 现场施工条件·····························132. 3 施工要求·································152. 4 技术规范·································162. 5 招标范围、计划工期和质量要求·············162. 6 巷道技术特征·····························193 施工准备···································263. 1 技术准备·································263. 2 施工队伍准备·····························263. 3 施工现场准备·····························273. 4 设备材料准备·····························273. 5 临时工业广场布置·························273. 6 供电·····································283. 7 通信·····································283. 8 供水及消防·······························283. 9 供热与洗浴·······························283. 10 排水及防洪······························283. 11 施工准备与工程排队······················304 施工方案和施工工艺··························304. 1 施工工艺综述·····························304. 2 施工方法·································304. 3 作业方式·································404. 4 施工关键技术·····························425 辅助生产系统································445. 1 提升、运输系统···························445. 2 压风·····································445. 3 排矸·····································445. 4 供水·····································455. 5 排水·····································455. 6 通风降尘·································455. 7 通讯、信号及明···························505. 8 供电系统·································515. 9 测量·····································516 施工特殊措施································51 6. 1 探放瓦斯··································51 6. 2 揭煤······································52 6. 3 防突安全措施······························547 施工组织与管理·······························557. 1 施工组织管理机构·························557. 2 施工管理·································568 施工进度计划及保证措施······················618. 1 工期安排·································618. 2 工期保证措施·····························629 施工质量标准及质量保证措施·················749. 1 质量目标及承诺···························749. 2 采用的质量标准···························759. 3 施工质量保证措施·························799. 4 质量保证体系·····························849. 5 主要检测仪器·····························8510 安全保证措施································8610. 1 安全管理目标····························8610. 2 安全管理体系····························8610. 3 安全管理措施····························8610. 4 施工安全技术措施························9010. 5 灾害预防································10611 冬雨季施工措施及地下管线等保护加固措施·····10711. 1 冬雨季施工措施··························1071. 2 管线及其它地上地下设施保护加固措施·······10812 文明施工及环境、职业健康保证措施···········10912. 1 文明施工及环境管理措施··················10912. 2 文物保护措施····························11112. 3 职业健康保护措施························11113 环境保护及水土保持的主要技术措施·············113 13. 1 水土保持措施·····························11313. 2 空气与水质的保护·························116 13. 3 废弃物的处理·····························116 13. 4 生活环境的保护···························117 13. 5 建筑物的保护·····························118 13. 6 生态保护·································118 13. 7 防洪措施·································119 14 与其他相关工程配合措施·······················11915 既有设施的保护措施···························12016 施工设备的进场计划···························12017 工程材料的进场计划···························12018 降低污染的措施·······························12119 减少噪音及扰民措施···························121前 言我公司对云南滇东能源有限责任公司白龙山煤矿C7+8煤层底板回风大巷掘进工程招标文件进行了认真研究,我们深信以我公司的装备能力、技术水平、施工经验完全可以快速、优质、高效地建成“云南滇东能源有限责任公司白龙山煤矿C7+8煤层底板回风大巷掘进工程”,并在工期和质量上达到或超过建设方的要求。若我公司中标承建“云南滇东能源有限责任公司白龙山煤矿C7+8煤层底板回风大巷掘进工程”,我们将把该项工程当作我公司的主要施工项目,从人力、物力和财力等方面予以全力保障。我们将按照系统工程理论和方法编制项目实施网络计划,并以此为依据控制项目的工期。以现场动态管理为基础采用可行的施工技术,以ISO9001:2000质量保证体系为基础进行全面质量控制;用事故树和生物钟进行安全防患预测分析和控制,精心组织,统筹安排、优质高效、安全快速、文明施工、确保工期及质量。1 积极响应招标要求,以优质工程为目标,实施工程项目管理,对工程质量、工期、成本实施有效控制。2 采用机械化配套的平巷作业法施工,以实现优质、快速、安全的目标。3采用中深孔、光面、弱震,弱、中爆破技术,根据岩石情况采用“短掘短锚尽量采用长掘长锚喷”的掘锚喷作业方式。4 按工序划分专业班组,实现工种工序专业化,提高工人的操作技术水平、达到优质、快速、高效的目标。5 施工设施均在巷道帮上悬挂。6两平巷的连接处,采用同时掘进、同时永久支护的施工方案,以确保其整体性。7施工设备棚采用轻型钢结构建筑,安装快捷方便,可缩短筹备期,降低工程造价。1 编制依据和原则1.1 编制依据 1.1.1 本施工设计执行如下国家现行的法律、法规、规范、标准(1)施工及验收规范、规程及标准1) 中华人们共和国安全生产法2) 中华人民共和国矿山安全法3) 建筑工程施工质量验收统一标准 (GB50300-2001)4) 建筑地基基础工程质量验收规范 (GB50202-2002)5) 砌体工程施工质量验收规范 (GB50203-2002)6) 混凝土工程施工质量验收规范 (GB0204-2002)7) 混凝土结构工程施工质量验收规范 (GB50204-2002)8) 钢筋焊接及验收规范 (JGJ18-84)9) 地下防水工程质量验收规范 (GB50208-2002)10) 工程测量规范 (GB50026-93)11) 建筑电气工程施工质量验收规范 (GB50303-2002)12) 矿山井巷工程施工及验收规