钢结构安装-jha
BPZ No1 PTA ProjectJob Hazard AnalysisContractor: STC Area:AC-1152文档来自于网络搜索Name of Operative:Detail job description: 钢结构安装/Steel Structure Erection 文档来自于网络搜索Signed checklist attached:JHA will not be approved by superintendentMSDS Attached: (if required)Other attachments as required: Approved By: HSE Manager:Approved by SuperintendantDate :Reviewed by:Safety engnineerJHA - INSTRUCTIONS FOR COMPLETIONInformation required:Project Title/No.The record should be clearly referenced as specific to the project under consideration.文档来自于网络搜索Contractor:Insert the name of the company responsible for the job hazard analysis.文档来自于网络搜索Risk Subject/No.This should identify which contractor's package is being assessed, e.g. steel erectors, scaffolders, etc., and the reference number of the generic job hazard analysis文档来自于网络搜索Prepared by; SignedInsert the name of the individual who has carried out the job hazard analysis.文档来自于网络搜索DateInsert the date of job hazard analysis.Activity/elementThe specific element under the job hazard analysis should be named. e.g. scaffolding, excavation etc.文档来自于网络搜索Potential HazardsThe hazards which arise out of the element under job hazard analysis should be listed, e.g. sharp edges, falls etc.文档来自于网络搜索Population at riskThe same hazard may represent different degrees of risk to different persons, e.g. on-site workers may not be at as much risk from site vehicles as passing members of the public. The different risks will need different control measures as appropriate, e.g. on-site workers may be given high visibility jackets and informed of vehicle routes, whereas traffic controllers may need to be put at the entrance to a site to protect members of the public. A note should be made of persons especially at risk, for example trainees, passing school children etc.文档来自于网络搜索Risk rating: LThe likelihood of occurrence should be inserted here, with for example, the following ratings, based on site accident reports;文档来自于网络搜索1Remote2Unlikely3Possible4 Likely5Probable6Highly probable.Risk rating: SThe severity of harm which could occur should be inserted here with, for example, the following ratings;文档来自于网络搜索1Minor injury2Chronic illness3Acute illness4Reportable injury (as defined by the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1985 (SI1985/2023 (RIDDOR)文档来自于网络搜索5Major injury, as defined by OSHA6DeathRisk Rating: RThe product of the likelihood and severity factors should be calculated and inserted to give the risk, i.e. a number between 1 and 36.文档来自于网络搜索PriorityA priority may be assigned to the risk, using the following ranges;文档来自于网络搜索Range 1-5= Low priority (L)Range 6-16= Medium priority (M)Range 17-36= High priority (H)Control measures specifiedThe controls which will be put in place to control the risk should be inserted here.Comments Any additional data relevant to the job hazard analysis may be added here.文档来自于网络搜索JOB HAZARD ANALYSISBPZ No1 PTA Project RISK SUBJECT: 钢结构安装/Steel Structure ErectionRISK NUMBER: Contractor:十公司/STCPrepared By:Signature:Date:RefNo.Activity/ElementPotential HazardsPopulationat RiskRisk RatingControl Measures SpecifiedResidualRiskS LR1班前会Tool box talk1. 错误信息Wrong information.AllMMM1. 给工人传达正确信息Give workers proper information.L2构件运输卸车Transportation and unloading of steel components1. 交通事故Traffic accident.1 按指定道路行驶Run on the designated routes. 2 限速15km/hSpeed limited as 15km/h. 2. 构件从车上滑落The steel components may slip from the trucks.3 对构件采取固定措施Take measures to secure steel components on truck .4 不得超载No overloading.3. 被构件碰伤Bumped by the component.5 设专人指挥Assign spotter when unloading. 6 设溜绳Set up taglines. 4. 砸脚挤手Hurt foot and hands.7 相互配合好Good work coordination.3钢结构地面组装Assembling of steel structure on ground.1. 被结构砸伤碰伤Stricken/cut by the steel structure. 1 使用挂有牌子地钢丝绳或尼龙带Nylon ropes or slings to be used must be tagged. 2 绑扎牢固且不得在吊物下经过或停留To be securely bound, and forbidden stand under or pass through the load. 2. 组装时挤伤手Hurt hands during assembling. 3 与吊车司机密切配合To properly cooperate with crane driver. 4 组装人员戴手套All the workers shall wear gloves.4吊车就位Crane locates.1 站位不当给吊装增加难度Increasing the operation difficulty because of cranes improper location.1. 设置警戒区Barricade the lifting area.2. 合理站位Locate in a proper way.2 基础不牢使吊车移位Bad ground level make the crane fail.3. 基础坚实垫道木Stabilize the crane with proper bed timber.5钢丝绳绑扎Tying slings.1 绑扎方法不正确导致吊物倾斜Improper way of tying slings cause to decline of load during ope